Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
302 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | BUS 287; E Rosedale St to Miller Ave | TARRANT | 2025-03-04 | $13,759,263.77 | $11,941,324.59 |
| Rank 2of 5 | FM 35 From IH 30 to Hunt CL | ROCKWALL | 2025-03-04 | $1,439,051.76 | $1,317,483.82 |
| Rank 2of 5 | SH 183; E US 377 to W Big Fossil Crk | TARRANT | 2025-02-07 | $3,259,362.09 | $3,019,197.05 |
| Rank 4of 6 | SH 183; TRAFFIC CI TO MALL CI | TARRANT | 2025-02-06 | $4,201,827.68 | $3,831,814.93 |
| Rank 7of 8 | FM 455 East of Marion Rd to US 377 | DENTON | 2025-02-06 | $6,989,809.18 | $5,118,707.90 |
| Rank 3of 4 | FLEXIBLE PAVEMENT REPAIR 02 0125 | DALLAS | 2025-01-15 | $875,438.50 | $800,466.21 |
| Low bidof 4 | FLEXIBLE PAVEMENT STRUCTURE RPR 03 0125 | DALLAS | 2025-01-08 | $1,020,538.00 | $1,020,538.00 |
| Rank 4of 4 | FY'25 Flexible Pavement Str Repr Johnson | JOHNSON | 2025-01-07 | $5,636,992.50 | $3,330,725.30 |
| Rank 4of 5 | FY '25, Flex Pave Structure Repair, Wise | WISE | 2025-01-07 | $6,891,392.26 | $6,475,473.33 |
| Rank 3of 7 | PREVENTIVE MAINTENANCE | PALO PINTO | 2024-12-03 | $4,284,982.90 | $4,012,954.18 |
| Rank 2of 6 | PREVENTIVE MAINTENANCE | TARRANT | 2024-12-03 | $15,248,826.45 | $14,389,594.52 |
| Rank 3of 4 | RESURFACE ROADWAY | COLLIN | 2024-11-06 | $6,166,090.96 | $5,486,284.92 |
| Rank 3of 5 | PREVENTIVE MAINTENANCE | ROCKWALL | 2024-09-05 | $4,561,133.58 | $4,169,539.20 |
| Low bidof 7 | REHABILITATE EXISTING ROADWAY | ELLIS | 2024-08-02 | $9,843,419.00 | $9,843,419.00 |
| Rank 3of 3 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | PARKER | 2024-08-01 | $3,621,387.00 | $3,345,738.00 |
| Rank 3of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | TARRANT | 2024-08-01 | $4,780,050.00 | $4,068,900.00 |
| Rank 2of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | KAUFMAN | 2024-07-09 | $3,151,459.90 | $3,005,175.00 |
| Rank 2of 2 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | ERATH | 2024-07-09 | $2,537,726.75 | $2,371,695.50 |
| Rank 2of 2 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | TARRANT | 2024-07-09 | $4,466,955.79 | $4,459,125.84 |
| Rank 2of 2 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | HOOD | 2024-07-09 | $2,768,902.15 | $2,536,168.80 |
| Rank 3of 4 | RECONSTRUCT EXISTING ROADWAY | TARRANT | 2024-06-06 | $8,889,396.35 | $8,095,510.00 |
| Rank 3of 4 | SURFACING/ROADWAY RESTORATION | COOKE | 2024-04-05 | $1,067,731.80 | $903,763.84 |
| Low bidof 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2024-04-04 | $979,868.50 | $979,868.50 |
| Low bidof 2 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2024-03-06 | $1,011,656.00 | $1,011,656.00 |
| Low bidof 4 | RESURFACE ROADWAY | JOHNSON | 2024-03-05 | $6,362,225.25 | $6,362,225.25 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.