Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
302 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2020-05-08 | $580,715.00 | $558,309.80 |
| Rank 4of 6 | RESURFACE ROADWAY | PARKER | 2020-05-07 | $1,146,428.69 | $936,540.03 |
| Low bidof 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2020-05-07 | $824,855.00 | $824,855.00 |
| Rank 4of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | ELLIS | 2020-05-07 | $2,291,333.20 | $1,369,228.55 |
| Rank 6of 6 | BASE FAILURE PAVEMENT REPAIR | HILL | 2020-05-07 | $1,329,860.30 | $812,251.75 |
| Rank 3of 4 | RESURFACE ROADWAY | TARRANT | 2020-04-08 | $3,520,506.07 | $3,418,266.67 |
| Rank 7of 7 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | NAVARRO | 2020-04-08 | $2,122,266.50 | $1,009,303.00 |
| Rank 2of 2 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | COLLIN | 2020-04-08 | $2,186,661.09 | $1,625,331.73 |
| Rank 3of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | KAUFMAN | 2020-04-08 | $4,617,642.00 | $3,633,670.00 |
| Rank 4of 7 | PAVEMENT REPAIR AND OVERLAY | CLAY | 2020-03-05 | $2,191,415.75 | $1,945,126.66 |
| Rank 5of 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | MONTAGUE | 2020-03-05 | $3,865,398.29 | $3,163,722.22 |
| Low bidof 5 | RESURFACE ROADWAY | TARRANT | 2020-03-05 | $2,691,548.85 | $2,691,548.85 |
| Rank 2of 3 | RESURFACE ROADWAY | ERATH | 2020-02-07 | $3,575,340.27 | $3,111,771.94 |
| Rank 3of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JOHNSON | 2020-02-07 | $856,073.70 | $750,411.40 |
| Rank 3of 7 | PREVENTIVE MAINTENANCE | JOHNSON | 2020-02-06 | $11,286,855.88 | $9,368,281.51 |
| Rank 3of 3 | RESURFACE ROADWAY | WISE | 2020-02-06 | $1,107,865.29 | $1,052,231.59 |
| Rank 4of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | GRAYSON | 2020-02-06 | $2,484,678.00 | $1,493,869.88 |
| Rank 2of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | TARRANT | 2020-01-10 | $867,500.00 | $807,002.00 |
| Rank 3of 6 | FLEXIBLE PAVEMENT REPAIR | WISE | 2020-01-10 | $3,619,142.72 | $3,360,528.52 |
| Rank 4of 5 | FLEXIBLE PAVEMENT REPAIR AND OVERLAY | PARKER | 2020-01-09 | $4,280,414.75 | $3,574,970.00 |
| Rank 2of 3 | FLEXIBLE PAVEMENT STRUCTURE REPAID | TARRANT | 2019-12-03 | $1,269,100.00 | $993,100.00 |
| Rank 4of 6 | BASE REPAIR, MILL, OVERLAY | DENTON | 2019-10-03 | $1,800,081.85 | $1,435,083.86 |
| Rank 3of 4 | GR, BS, DR, PAV | JOHNSON | 2019-08-07 | $5,547,246.25 | $4,345,364.38 |
| Low bidof 3 | RESURFACE ROADWAY | TARRANT | 2019-08-07 | $1,243,381.45 | $1,243,381.45 |
| Rank 2of 4 | RESURFACE ROADWAY | TARRANT | 2019-08-07 | $3,654,671.08 | $3,540,605.35 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.