Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
205 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 9 | FY26 Delineator Installation S. Tarrant | TARRANT | 2025-12-17 | $249,560.00 | $180,889.04 |
| Rank 3of 3 | BU 290H Seal Coat: FM 1488 to Harris C/L | WALLER | 2025-12-03 | $2,496,514.77 | $2,311,694.30 |
| Rank 2of 3 | FY26 Foam Injection Tarrant County | TARRANT | 2025-11-06 | $993,200.00 | $727,450.00 |
| Rank 4of 4 | Illumination-Hopkins Co. | HOPKINS | 2025-10-16 | $457,157.50 | $299,930.00 |
| Rank 4of 6 | FY2026 - Loop Detector | HARRIS | 2025-10-09 | $1,399,840.00 | $1,127,272.00 |
| Rank 10of 10 | BMT_IH0010_3 (2022 HSIP) SAFETY LIGHTING | CHAMBERS | 2025-10-08 | $1,429,594.80 | $1,064,705.18 |
| Rank 6of 7 | Walnut Creek Dr: Debbie Ln to Saving Pla | TARRANT | 2025-10-08 | $655,767.00 | $290,075.00 |
| Rank 6of 7 | IH 610 - Upgrade Safety Lighting - 3 | HARRIS | 2025-09-05 | $13,746,699.00 | $9,515,227.49 |
| Rank 9of 9 | US 290, FM 529 to IH 610 | HARRIS | 2025-09-05 | $4,188,847.50 | $2,447,344.00 |
| Rank 6of 6 | FY2025 - Preventive Mnt of Sgnl Equip | HARRIS | 2025-09-05 | $2,945,737.00 | $1,678,290.00 |
| Rank 3of 3 | 2026 Seal Coat-US96(RE 255-FM 2799) | JASPER | 2025-09-04 | $15,139,951.87 | $13,687,083.36 |
| Rank 3of 6 | FY26-Maintenance of Illumination Systems | HARRIS | 2025-09-04 | $3,710,500.00 | $2,671,630.00 |
| Rank 11of 12 | BMT_SH0062_3 (2022 HSIP) SAFETY LIGHTING | ORANGE | 2025-08-08 | $2,129,944.15 | $1,415,941.13 |
| Rank 9of 9 | FY '26, Bridge Preventative Maintenance | JOHNSON | 2025-08-08 | $1,383,689.00 | $637,481.50 |
| Rank 5of 5 | IH610:Buffalo Spd,Cullen, Calais&Wayside | HARRIS | 2025-08-07 | $3,120,164.90 | $2,464,072.63 |
| Rank 6of 9 | SH 360; MAYFIELD TO STONE MYERS | TARRANT | 2025-07-02 | $1,638,423.50 | $1,172,135.00 |
| Low bidof 4 | Arapaho Rd at Surveyor Blvd in Addison | DALLAS | 2025-07-02 | $1,120,692.25 | $1,120,692.25 |
| Rank 2of 4 | Illumination Maintenance-2025 | ANGELINA | 2025-06-11 | $385,945.00 | $363,983.30 |
| Rank 9of 9 | CRP_US0281_1_5/8_LIVEOAK_HSIP | LIVE OAK | 2025-06-04 | $1,900,280.00 | $1,021,498.20 |
| Rank 3of 6 | SL 12 at Peavy Rd | DALLAS | 2025-06-04 | $4,531,906.93 | $4,223,542.78 |
| Rank 5of 5 | SH 347(HOGABOOM RD-SH 73 FR) MILL & OV | JEFFERSON | 2025-06-04 | $2,796,967.50 | $2,363,295.38 |
| Rank 4of 7 | BMT_IH0010_2(2021 HSIP)SAFETY LIGHTING | JEFFERSON | 2025-05-02 | $1,865,615.50 | $1,596,374.37 |
| Low bidof 5 | SL 12 From S of John West to Tillman | DALLAS | 2025-05-02 | $3,099,433.21 | $3,099,433.21 |
| Rank 5of 7 | IH 69, IH 10 to Langley Rd | HARRIS | 2025-05-01 | $7,719,385.00 | $6,683,209.00 |
| Rank 4of 4 | Trinity Blvd, 1 of 1 | TARRANT | 2025-03-05 | $1,893,302.50 | $1,235,855.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.