Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
130 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 5 | ROW Mowing Fannin Co. FY26 | FANNIN | 2026-01-15 | $394,132.00 | $380,479.00 |
| Rank 6of 7 | ROW Mowing Grayson Co. FY26 | GRAYSON | 2026-01-15 | $406,526.00 | $346,572.00 |
| Rank 7of 10 | BPM South - FY 2026 | KIMBLE | 2026-01-15 | $546,123.00 | $365,527.00 |
| Rank 7of 11 | FY 2026 BPM 2nd supplemental | CHILDRESS | 2026-01-15 | $962,656.00 | $576,246.00 |
| Rank 7of 8 | Removal and Disposal of Driftwood | DENTON | 2026-01-14 | $222,317.50 | $140,047.15 |
| Rank 2of 3 | Rockwall Veg Mgmt FY 2026 | ROCKWALL | 2026-01-14 | $671,620.00 | $643,984.00 |
| Rank 5of 5 | FY26 - Washington Tree Removal - 01 | WASHINGTON | 2026-01-13 | $126,810.00 | $91,131.00 |
| Rank 6of 6 | FY26 - Brazos Tree Removal - 01 | BRAZOS | 2026-01-13 | $198,310.00 | $111,514.41 |
| Low bidof 7 | FY 26-DISTRICT WIDE-BRIDGE FUA | JEFFERSON | 2026-01-07 | $528,287.00 | $528,287.00 |
| Rank 2of 12 | Bridge Maintenance (2026) North Segment | ECTOR | 2026-01-07 | $1,899,157.00 | $1,656,587.00 |
| Rank 5of 6 | FY 26 Districtwide Bridge Maintenance | TRAVIS | 2026-01-06 | $889,017.50 | $732,645.75 |
| Low bidof 12 | Bridge Maintenance (2026) South Segment | ECTOR | 2026-01-06 | $498,387.00 | $498,387.00 |
| Rank 6of 6 | Full Depth Concrete Repair 09 0126 | ELLIS | 2026-01-06 | $1,775,455.00 | $1,160,562.50 |
| Rank 7of 13 | FY 2026 - BPM S. Tarrant | TARRANT | 2026-01-06 | $1,203,905.00 | $960,310.00 |
| Rank 4of 4 | 2026-01 San Jacinto MBGF | SAN JACINTO | 2026-01-05 | $573,135.00 | $186,220.00 |
| Rank 4of 4 | 2026-01 San Augustine MBGF | SAN AUGUSTINE | 2026-01-05 | $326,550.00 | $120,970.05 |
| Rank 3of 4 | On Call Pothole-Grayson FY26 | GRAYSON | 2025-12-18 | $385,012.00 | $379,000.00 |
| Rank 4of 5 | ROW Mowing Lamar Co. FY26 | LAMAR | 2025-12-18 | $407,406.00 | $306,977.00 |
| Rank 4of 10 | 6494-47-001 BPM | REEVES | 2025-12-16 | $706,480.00 | $499,338.00 |
| Rank 11of 11 | BPM FM709 01 1225 | NAVARRO | 2025-12-10 | $366,546.00 | $134,302.00 |
| Rank 4of 7 | R/R Concrete Barrier 07 12.25 | COLLIN | 2025-12-10 | $221,040.00 | $89,809.00 |
| Low bidof 7 | FY 2026 BPM | EL PASO | 2025-12-09 | $555,941.00 | $555,941.00 |
| Rank 6of 8 | FY 26 WINGWALL REPAIR | SMITH | 2025-12-09 | $747,506.00 | $439,998.60 |
| Rank 8of 12 | FY26 Supplemental BPM | CHILDRESS | 2025-12-05 | $723,526.00 | $554,446.00 |
| Rank 3of 7 | 0027-08-190 | FORT BEND | 2025-12-03 | $1,003,553.00 | $557,545.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.