Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
70 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 12of 12 | DISTRICTWIDE GUARDRAIL REPAIR | ECTOR | 2020-11-05 | $4,487,700.00 | $2,208,069.00 |
| Rank 11of 14 | BRIDGE JOINT REPAIR | ECTOR | 2020-11-05 | $349,206.00 | $173,811.00 |
| Rank 8of 8 | INSTALL MEDIAN BARRIER | ECTOR | 2020-11-04 | $3,356,051.25 | $2,056,073.16 |
| Rank 6of 7 | MBGF, CHAINLINK FENCE & ROCK WALL REPAIR | EL PASO | 2020-11-04 | $1,048,450.00 | $794,293.20 |
| Rank 3of 5 | BARRICADES, SIGNS AND TRAFFIC CONTROL | EL PASO | 2020-11-04 | $382,650.00 | $342,860.00 |
| Rank 3of 5 | INSTALL ADVANCE WARNING SIGNS/CHEVRONS | HUDSPETH | 2020-09-03 | $1,092,386.95 | $960,978.69 |
| Rank 3of 5 | DISTRICTWIDE CRACK SEAL | JEFF DAVIS | 2020-09-03 | $824,695.00 | $753,812.50 |
| Rank 2of 3 | MISCELLANEOUS CONCRETE REPAIR | EL PASO | 2020-09-03 | $489,850.00 | $486,280.00 |
| Rank 4of 4 | MISCELLANEOUS CONCRETE REPAIR | EL PASO | 2020-09-03 | $472,850.00 | $363,194.00 |
| Rank 5of 5 | PICNIC AREA MAINTENANCE | CULBERSON | 2020-08-31 | $128,550.00 | $53,100.00 |
| Rank 4of 4 | PICNIC AREA MAINTENANCE | EL PASO | 2020-08-31 | $58,000.00 | $38,736.00 |
| Rank 5of 5 | PICNIC AREA MAINTENANCE | HUDSPETH | 2020-08-31 | $99,600.00 | $42,000.00 |
| Rank 3of 3 | PEDESTRIAN SAFETY IMPROVEMENTS | EL PASO | 2020-08-06 | $2,566,390.08 | $1,665,138.83 |
| Rank 7of 7 | INSTALLATION OF CONCRETE TRAFFIC BARRIER | EL PASO | 2020-08-05 | $3,254,567.70 | $2,235,501.70 |
| Rank 3of 7 | INSTALLATION OF BOX CULVERT AND ROADWAY APPROACHES | HUDSPETH | 2020-08-05 | $512,909.00 | $423,112.00 |
| Rank 7of 7 | BASE REPAIR | BEXAR | 2020-08-05 | $5,911,620.50 | $2,587,245.75 |
| Rank 6of 6 | INSTALL CENTERLINE/SHOULDER RUMBLE STRIPS | CULBERSON | 2020-07-09 | $986,109.90 | $539,478.55 |
| Rank 5of 7 | GREEN RIBBON LANDSCAPE IMPROVEMENT | EL PASO | 2020-07-09 | $987,932.00 | $507,006.75 |
| Rank 4of 11 | INSTALL MEDIAN CABLE BARRIER | EL PASO | 2020-07-08 | $4,476,539.00 | $4,020,479.50 |
| Rank 9of 11 | ROADWAY REHABILITATION | REEVES | 2020-06-05 | $6,753,800.40 | $5,198,387.00 |
| Rank 2of 8 | MILL & OVERLAY CLEANING/RESEAL BRIDGE JOINTS | EL PASO | 2020-06-04 | $872,291.76 | $777,686.30 |
| Rank 4of 7 | REHABILITATION OF ROADWAY | EL PASO | 2020-05-08 | $2,955,221.34 | $2,225,974.74 |
| Rank 7of 9 | BPM | EL PASO | 2020-05-08 | $584,745.00 | $485,854.80 |
| Rank 6of 10 | FY 2020 BRIDGE MAINTENANCE (EL PASO COUNTY) | EL PASO | 2020-05-07 | $3,733,725.00 | $2,570,503.40 |
| Rank 2of 3 | FLEXIBLE PAVEMENT REPAIR | CULBERSON | 2020-05-07 | $517,700.00 | $431,376.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.