Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
305 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | RESTORATION OF ROADWAY | HARRIS | 2021-02-04 | $1,290,678.85 | $969,114.40 |
| Rank 3of 6 | PLANING, PAVEMENT REPAIR, SEAL COAT AND 1.5" HMA | BRAZORIA | 2021-02-04 | $887,758.23 | $858,674.28 |
| Low bidof 5 | BASE REPAIR MILL-OVERLAY | LIBERTY | 2021-02-04 | $573,577.25 | $573,577.25 |
| Rank 9of 16 | SCOUR REPAIR | BRAZOS | 2020-12-17 | $343,284.00 | $204,920.00 |
| Rank 3of 3 | OVERLAY | NEWTON | 2020-12-03 | $392,494.50 | $337,381.76 |
| Rank 3of 3 | OVERLAY ROADWAY | HARDIN | 2020-12-03 | $1,046,796.65 | $893,784.70 |
| Rank 2of 2 | OVERLAY | JEFFERSON | 2020-12-03 | $849,731.80 | $797,913.14 |
| Low bidof 5 | BASE REPAIR & OVERLAY | CHAMBERS | 2020-11-05 | $235,487.35 | $235,487.35 |
| Low bidof 3 | OVERLAY | NEWTON | 2020-11-05 | $878,620.85 | $878,620.85 |
| Rank 3of 4 | MILLING AND OVERLAY | HARRIS | 2020-11-05 | $859,964.18 | $783,387.50 |
| Rank 6of 6 | RESTORE ROADWAY | JACKSON | 2020-10-02 | $3,060,512.90 | $2,486,470.25 |
| Rank 3of 5 | HIGHWAY IMPROVEMENT | GALVESTON | 2020-10-02 | $572,655.75 | $476,344.25 |
| Low bidof 8 | FULL DEPTH FLEXIBLE PAVEMENT REPAIR | CHAMBERS | 2020-10-02 | $462,140.35 | $462,140.35 |
| Rank 4of 5 | SURFACING/ROADWAY RESTORATION | BRAZORIA | 2020-09-03 | $1,581,217.85 | $1,468,982.15 |
| Rank 4of 6 | ADD LEFT TURN LANES | LAVACA | 2020-08-05 | $1,290,912.50 | $1,216,444.86 |
| Rank 3of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JEFFERSON | 2020-07-09 | $1,016,076.80 | $902,311.60 |
| Rank 3of 7 | PAVEMENT REPAIR | KERR | 2020-07-08 | $1,096,056.85 | $959,228.30 |
| Rank 4of 5 | BASE FAILURE PAVEMENT REPAIR | LIMESTONE | 2020-05-08 | $952,738.60 | $434,030.75 |
| Rank 4of 4 | BASE FAILURE PAVEMENT REPAIRS | MCLENNAN | 2020-05-08 | $1,260,222.00 | $827,443.70 |
| Rank 3of 4 | MILL AND OVERLAY | CHAMBERS | 2020-05-07 | $578,492.83 | $495,427.70 |
| Rank 4of 5 | BASE FAILURE PAVEMENT REPAIR | FALLS | 2020-05-07 | $623,748.60 | $435,115.30 |
| Rank 5of 6 | BASE FAILURE PAVEMENT REPAIR | HILL | 2020-05-07 | $1,308,123.20 | $812,251.75 |
| Low bidof 4 | ACP OVERLAY | BRAZORIA | 2020-04-09 | $781,874.98 | $781,874.98 |
| Rank 5of 5 | PLANING, SEAL COAT, ACP OVERLAY AND TEXTURING | WALLER | 2020-02-07 | $2,097,321.35 | $1,597,357.13 |
| Rank 5of 5 | ADD 5 FT SHLDR, PLANING, LEVEL-UP AND 1.5 IN PFC | WALLER | 2020-02-06 | $2,045,738.69 | $1,784,542.43 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.