Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
355 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 6 | Tree Trimming in Coryell County | CORYELL | 2025-04-21 | $252,204.00 | $223,244.00 |
| Rank 2of 6 | Ditch and Culvert-SSAO 25 | HOPKINS | 2025-04-17 | $111,555.00 | $94,565.00 |
| Rank 7of 9 | TREE TRIMMING AND BRUSH REMOVAL 2025 | MILLS | 2025-04-17 | $868,438.00 | $581,070.00 |
| Rank 2of 3 | FY25 - Brenham AO Tree Removal | BURLESON | 2025-04-08 | $441,750.00 | $428,730.00 |
| Low bidof 3 | FY 25 Lg Guide Signs-Corridor/IH27 | LUBBOCK | 2025-04-03 | $5,554,538.56 | $5,554,538.56 |
| Low bidof 5 | BMT (PORT WAYFINDING SIGNAGE) | JEFFERSON | 2025-04-03 | $198,960.00 | $198,960.00 |
| Low bidof 6 | IH 27 South Large Sign Replacements | POTTER | 2025-04-03 | $1,712,643.68 | $1,712,643.68 |
| Rank 4of 6 | BMT_SH0062_1(2022 HSIP) CHEVRONS (CURVE) | ORANGE | 2025-04-03 | $499,342.00 | $279,605.00 |
| Rank 11of 12 | 2025 Callout Concrete Repair | TAYLOR | 2025-04-01 | $887,700.00 | $643,004.00 |
| Rank 2of 8 | Miscellaneous Concrete Repair - DW | MCLENNAN | 2025-03-20 | $521,165.00 | $420,190.00 |
| Rank 3of 7 | 2025-03 Sabine Tree and Brush Removal | SABINE | 2025-03-19 | $267,310.00 | $259,535.00 |
| Low bidof 7 | 2025-03 Trinity Tree and Brush Removal | TRINITY | 2025-03-19 | $221,945.00 | $221,945.00 |
| Rank 6of 7 | Reflective Pav Markings 01 0325 | NAVARRO | 2025-03-12 | $84,041.55 | $67,842.38 |
| Rank 4of 7 | Specialty Markings 01 0325 | NAVARRO | 2025-03-12 | $82,484.00 | $56,997.00 |
| Low bidof 8 | FY25 Brazoria Guardrail RMC | BRAZORIA | 2025-03-11 | $678,427.00 | $678,427.00 |
| Rank 4of 4 | 6480-62-001 Culvert Cleaning | REEVES | 2025-03-11 | $196,488.00 | $132,476.00 |
| Rank 10of 14 | FY2025_VA_Bridge Maint - BMN | ANGELINA | 2025-03-05 | $1,058,980.00 | $821,221.00 |
| Low bidof 9 | Fannin County HSIP | FANNIN | 2025-03-05 | $86,689.50 | $86,689.50 |
| Rank 10of 19 | FM 2571 - AT Gazley Crk - 25 BMIP | BASTROP | 2025-03-04 | $252,700.00 | $180,204.00 |
| Low bidof 15 | SFT | FM 218 | @ FM 1702 | HAMILTON | 2025-03-04 | $133,517.11 | $133,517.11 |
| Rank 2of 5 | RAISED PAVEMENT MARKERS - BELL DW | BELL | 2025-02-25 | $433,230.00 | $414,447.50 |
| Rank 5of 12 | FY25 BPM IH35/US90A/FM3009 | COMAL | 2025-02-20 | $171,076.00 | $100,463.00 |
| Rank 10of 13 | FY25 BPM FM 306 AT SUCHE AND POTTER CRK | COMAL | 2025-02-20 | $232,778.00 | $135,300.00 |
| Rank 9of 11 | FY25 BPM SH 41 AT DRAW/SH 16 AT DREAN CR | KERR | 2025-02-20 | $116,468.00 | $69,326.00 |
| Rank 4of 12 | On Call Tree Removal FY25 Hunt Co. | HUNT | 2025-02-20 | $144,150.00 | $105,885.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.