Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
254 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 8 | IH 10 at Wayside Dr and McCarty St | HARRIS | 2026-07-14 | $643,294.00 | $488,125.00 |
| Rank 2of 5 | BPM 6500-97-001 | WALLER | 2026-07-14 | $838,984.00 | $716,400.00 |
| Rank 3of 8 | US 190_At Trinity River - BMIP | POLK | 2026-07-02 | $3,569,438.80 | $3,332,948.20 |
| Rank 2of 10 | Bridge Repair and Maintenance | HARRIS | 2026-07-02 | $1,068,809.00 | $898,477.00 |
| Rank 3of 5 | FY 26-CHAMBERS/LIBERTY CNTYS-BRIDGE FUA | JEFFERSON | 2026-07-01 | $5,013,520.50 | $3,928,543.50 |
| Rank 6of 6 | US 84 Safety Lighting | SCURRY | 2026-07-01 | $1,068,343.40 | $814,950.00 |
| Rank 2of 11 | SH 71- At Oatman Crk (BMIP24) | LLANO | 2026-07-01 | $601,217.75 | $526,435.00 |
| Rank 3of 8 | Various Bridge Repairs for NHAO | HARRIS | 2026-07-01 | $2,344,635.50 | $1,538,016.00 |
| Low bidof 7 | Concrete Pavement Repair McLennan DW | HILL | 2026-07-01 | $1,432,275.00 | $1,432,275.00 |
| Rank 7of 11 | BPM - FY 2027 | MCLENNAN | 2026-07-01 | $1,489,012.50 | $922,471.00 |
| Rank 10of 10 | SH 249 at Spring Cypress Rd Signal | HARRIS | 2026-06-03 | $2,485,895.41 | $1,523,084.25 |
| Rank 7of 7 | PHR_FM2220_FY24 | HIDALGO | 2026-06-03 | $1,379,852.35 | $837,743.21 |
| Rank 7of 7 | AUS_CoAHARRISBRANCHPKY(HSIP23) | TRAVIS | 2026-06-03 | $813,541.24 | $405,662.40 |
| Rank 4of 9 | FY26DWRehab&Maint | NUECES | 2026-06-03 | $525,165.00 | $478,472.60 |
| Rank 5of 9 | BMN | Bridge Joint Repair Districtwide | MCLENNAN | 2026-06-03 | $4,393,504.75 | $3,058,058.00 |
| Rank 4of 8 | RM 620 - Colorado River (BMIP24) | TRAVIS | 2026-06-02 | $3,863,896.13 | $3,335,184.39 |
| Rank 6of 9 | Clean and Seal Joints 04 0526 | DENTON | 2026-05-13 | $335,580.00 | $238,282.00 |
| Rank 3of 5 | Concrete RMC 6485-14-001 | MONTGOMERY | 2026-05-12 | $983,224.00 | $568,800.00 |
| Rank 8of 14 | BRIDGE BMIP US 83 SB @ BU 84 UPRR | TAYLOR | 2026-05-07 | $4,889,399.00 | $4,004,004.00 |
| Rank 5of 8 | IH 45 at McKinney Ramp | HARRIS | 2026-05-07 | $7,384,087.00 | $3,899,831.00 |
| Rank 7of 9 | US 82 Oak Ridge safety lighting | COOKE | 2026-05-06 | $825,546.53 | $664,203.25 |
| Rank 7of 8 | Misc Concrete Repair DW | MCLENNAN | 2026-04-08 | $1,276,651.00 | $755,540.00 |
| Rank 4of 6 | US 67/US 377 at Bosque River | ERATH | 2026-04-07 | $3,672,303.40 | $2,983,533.12 |
| Rank 5of 6 | Misc Concrete Repair 07 03.26 | COLLIN | 2026-03-11 | $64,212.00 | $43,579.00 |
| Rank 11of 12 | Bridge Preventative Maintenance 09 0326 | ELLIS | 2026-03-11 | $655,552.00 | $369,500.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.