Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
254 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 7 | R/R Concrete Barrier 07 12.25 | COLLIN | 2025-12-10 | $223,560.00 | $89,809.00 |
| Rank 7of 7 | FY 2026 BPM | EL PASO | 2025-12-09 | $914,108.00 | $555,941.00 |
| Rank 2of 4 | FY26 Buffalo Curb Repair | LEON | 2025-12-09 | $99,342.00 | $79,657.64 |
| Rank 4of 8 | FY 26 WINGWALL REPAIR | SMITH | 2025-12-09 | $648,779.00 | $439,998.60 |
| Rank 9of 12 | FY26 Supplemental BPM | CHILDRESS | 2025-12-05 | $789,942.00 | $554,446.00 |
| Low bidof 5 | US84-CR7200 FY26 HSIP | LUBBOCK | 2025-12-03 | $695,678.34 | $695,678.34 |
| Rank 6of 7 | 0027-08-190 | FORT BEND | 2025-12-03 | $1,737,457.00 | $557,545.00 |
| Rank 3of 7 | US 183 at Clear Fork Brazos River | STEPHENS | 2025-12-03 | $1,346,606.75 | $1,341,645.00 |
| Low bidof 5 | FM8 at FM 219 Intersection | ERATH | 2025-12-03 | $156,215.32 | $156,215.32 |
| Low bidof 4 | US90 Illumination at Off Ramp | VAL VERDE | 2025-12-03 | $571,506.10 | $571,506.10 |
| Low bidof 10 | BMIP 2612 | DE WITT | 2025-12-02 | $1,923,922.10 | $1,923,922.10 |
| Rank 6of 8 | FULL DEPTH CONCRETE REPAIR KAUFMAN FY'26 | KAUFMAN | 2025-12-02 | $2,059,850.00 | $1,708,740.00 |
| Rank 2of 8 | FY26 - Walker IH45 Bridge Repair - 11 | WALKER | 2025-11-24 | $148,885.50 | $114,511.00 |
| Rank 4of 6 | Concrete transition work-Hopkins Co. | HOPKINS | 2025-11-20 | $214,730.00 | $190,653.43 |
| Rank 5of 7 | FY2026 FM2252 AT DRAIN | BEXAR | 2025-11-12 | $73,008.00 | $50,807.00 |
| Rank 3of 7 | FY 26 Bridge Rail Repair | WOOD | 2025-11-12 | $168,812.00 | $143,287.00 |
| Rank 6of 7 | Repair/Replace Concrete Barrier 09 1125 | ELLIS | 2025-11-12 | $725,464.00 | $408,528.00 |
| Rank 9of 9 | IH 30 WBFR Ent Ramp to SL 12 | DALLAS | 2025-11-05 | $1,627,455.81 | $1,127,949.43 |
| Rank 3of 8 | Bridge Repairs - VA Loc in Galveston CO | GALVESTON | 2025-11-05 | $3,609,722.30 | $2,839,710.00 |
| Rank 3of 8 | SH 238 INSTALL LED CHEVRON 2609 | CALHOUN | 2025-11-05 | $2,262,061.48 | $1,886,657.91 |
| Rank 3of 7 | Bridge Work DW | HILL | 2025-11-05 | $1,516,730.00 | $1,179,951.00 |
| Rank 6of 12 | 2026 BPM Graham Area | ARCHER | 2025-10-28 | $647,702.00 | $491,415.00 |
| Rank 7of 7 | FY 26 SITE SPECIFIC BPM | ANDERSON | 2025-10-21 | $495,996.00 | $322,159.49 |
| Rank 2of 6 | FY 26 SITE SPECIFIC BPM NORTH | CHEROKEE | 2025-10-21 | $275,976.00 | $194,460.10 |
| Rank 5of 5 | FY26 US 87 AT JAMES CREEK BRIDGE REPAIR | BEXAR | 2025-10-15 | $85,029.00 | $40,152.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.