Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
257 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 10of 12 | FM500 CR205 TO CR211 | SAN SABA | 2025-09-04 | $195,337.65 | $94,590.00 |
| Rank 8of 10 | SH36 0.4 MI W OF FM587 TO CR274 | EASTLAND | 2025-09-04 | $88,651.60 | $41,785.00 |
| Low bidof 6 | IH 45 at Stokes Rd. Bridge Repair | HARRIS | 2025-08-19 | $289,066.00 | $289,066.00 |
| Rank 2of 6 | Replace SEJ Joints and Bridge Repairs | HARRIS | 2025-08-12 | $305,107.00 | $249,972.00 |
| Rank 2of 6 | SH 225 at Bearle St. Bridge Repair | HARRIS | 2025-08-12 | $550,356.00 | $483,400.00 |
| Low bidof 6 | Backwall and Bridge Repair | HARRIS | 2025-08-12 | $280,600.00 | $280,600.00 |
| Rank 7of 12 | BMT_SH0062_3 (2022 HSIP) SAFETY LIGHTING | ORANGE | 2025-08-08 | $1,699,692.00 | $1,415,941.13 |
| Rank 5of 14 | FM 1830 from US 377 to FM 407 | DENTON | 2025-08-08 | $466,751.00 | $288,012.00 |
| Rank 3of 9 | 2026 - BPM WF Area | WICHITA | 2025-08-08 | $1,628,896.50 | $1,492,330.00 |
| Low bidof 12 | DW Bridge Concrete Repair 2508 | DE WITT | 2025-08-08 | $223,847.00 | $223,847.00 |
| Rank 10of 12 | Richmond-Clardy Sidewalk Improvements | HUNT | 2025-08-07 | $732,028.95 | $482,000.00 |
| Rank 5of 6 | Bridge Joint Cleaning Sealing 07 0725 | COLLIN | 2025-07-09 | $327,030.00 | $199,431.00 |
| Rank 7of 7 | FY25 - Freestone US84 - 07 | FREESTONE | 2025-07-08 | $389,084.00 | $194,063.50 |
| Rank 2of 7 | PR 22 Nueces Cathodic Protection BMIP | NUECES | 2025-07-02 | $1,915,242.18 | $1,759,250.97 |
| Rank 2of 9 | US 90 (@ HILLEBRANDT BAYOU)BRIDGE REHAB | JEFFERSON | 2025-07-01 | $5,976,727.99 | $5,167,739.54 |
| Rank 2of 11 | FY 26 BPM | JASPER | 2025-07-01 | $605,231.40 | $594,805.82 |
| Rank 6of 6 | FY25 - Freestone FM 489 BPM | FREESTONE | 2025-06-12 | $248,559.00 | $188,514.00 |
| Rank 5of 9 | VA Location - Bridge Repair | HARRIS | 2025-06-05 | $1,965,931.00 | $1,851,563.00 |
| Rank 6of 8 | BPM FY 2026 | POTTER | 2025-06-05 | $1,384,120.80 | $1,052,829.50 |
| Rank 4of 4 | Concrete Metro 2025 | HARRIS | 2025-06-04 | $8,603,074.50 | $5,144,697.90 |
| Rank 7of 12 | FY25 - Freestone IH 45 BPM - 05 | FREESTONE | 2025-05-06 | $591,158.40 | $422,313.00 |
| Rank 2of 5 | FY 27 RR Bridges @ Various Locations | SMITH | 2025-05-02 | $2,888,577.01 | $2,796,332.40 |
| Low bidof 6 | FY 2025 BTAO BR FUA Repairs | TRAVIS | 2025-05-02 | $865,709.00 | $865,709.00 |
| Rank 3of 9 | BMIP SL 322 NB AT UPRR TAYLOR CO | TAYLOR | 2025-05-01 | $1,396,564.00 | $1,338,126.80 |
| Low bidof 9 | FY 25 - AUS BR Maint | TRAVIS | 2025-05-01 | $659,811.50 | $659,811.50 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.