Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
145 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | SH 31 SH 31/BS 31D Split to FM 1393 | NAVARRO | 2025-10-09 | $16,306,282.03 | $14,985,367.57 |
| Low bidof 8 | FM 917; IH 35W to CR 616 | JOHNSON | 2025-10-08 | $4,574,922.62 | $4,574,922.62 |
| Low bidof 3 | 2026 District Wide Seal Coat US 62 | CHILDRESS | 2025-10-08 | $6,688,614.40 | $6,688,614.40 |
| Rank 3of 5 | IH 20 EB Safety Rest Area Rehabilitation | EASTLAND | 2025-10-08 | $8,999,044.11 | $7,760,918.61 |
| Rank 3of 4 | SC | FM 1991 | FM 219 | SH 22 | BOSQUE | 2025-09-05 | $5,177,081.87 | $4,972,194.16 |
| Rank 3of 7 | SH 199; PAUL MEADOR RD TO NORTHSIDE CENT | TARRANT | 2025-09-04 | $9,677,139.16 | $8,888,715.70 |
| Low bidof 3 | FY'26 Flex Pave, Palo Pinto | PALO PINTO | 2025-08-08 | $6,554,076.08 | $6,554,076.08 |
| Rank 3of 5 | FY26 Flexible Pavement Repair S. Tarrant | TARRANT | 2025-07-02 | $3,294,450.61 | $3,130,822.01 |
| Low bidof 3 | FY 2025 - MMC Hot Mix Erath | ERATH | 2025-07-02 | $2,037,000.00 | $2,037,000.00 |
| Rank 4of 6 | FY 2025 - MMC Hot Mix Parker | PARKER | 2025-07-02 | $695,000.00 | $598,000.00 |
| Rank 6of 6 | FY'26, Flexible Pave, North Tarrant | TARRANT | 2025-07-01 | $5,497,500.00 | $4,210,079.00 |
| Rank 2of 3 | FY26 Flexible Pavement Repair HES | ERATH | 2025-07-01 | $4,225,450.59 | $3,185,927.60 |
| Rank 3of 4 | FY'25 Flexible Pavement Str Repr Johnson | JOHNSON | 2025-01-07 | $4,175,714.54 | $3,330,725.30 |
| Rank 2of 4 | SEAL COAT | HOOD | 2024-12-04 | $10,887,003.08 | $9,721,843.05 |
| Low bidof 3 | PREVENTIVE MAINTENANCE | ERATH | 2024-12-03 | $6,375,558.15 | $6,375,558.15 |
| Rank 4of 7 | PREVENTIVE MAINTENANCE | PALO PINTO | 2024-12-03 | $4,342,446.16 | $4,012,954.18 |
| Rank 4of 4 | SEAL COAT | MONTAGUE | 2024-11-06 | $12,445,492.30 | $11,361,820.16 |
| Rank 2of 3 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | PARKER | 2024-08-01 | $3,566,978.00 | $3,345,738.00 |
| Low bidof 1 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | PALO PINTO | 2024-08-01 | $5,457,150.00 | $5,457,150.00 |
| Low bidof 1 | HOT MIX | ERATH | 2024-08-01 | $1,425,000.00 | $1,425,000.00 |
| Rank 3of 3 | HOT MIX | JOHNSON | 2024-08-01 | $1,274,750.00 | $979,137.50 |
| Low bidof 2 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | ERATH | 2024-07-09 | $2,371,695.50 | $2,371,695.50 |
| Low bidof 2 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | HOOD | 2024-07-09 | $2,536,168.80 | $2,536,168.80 |
| Low bidof 3 | RESURFACE ROADWAY | ERATH | 2024-03-06 | $7,391,389.42 | $7,391,389.42 |
| Low bidof 2 | RESURFACE ROADWAY | HOOD | 2024-03-06 | $6,993,915.90 | $6,993,915.90 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.