Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
154 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | US385-1 | ECTOR | 2025-06-05 | $8,590,346.20 | $8,360,128.00 |
| Rank 5of 6 | SH 350 MITCHELL COUNTY | MITCHELL | 2025-06-05 | $7,889,155.43 | $5,996,861.40 |
| Rank 3of 5 | IH20_E_StantonInterchange_HowardCL_Rehab | MARTIN | 2025-06-05 | $14,034,618.52 | $11,318,569.20 |
| Rank 2of 3 | SH158-1/2 | ECTOR | 2025-06-04 | $7,330,796.70 | $5,970,353.45 |
| Rank 4of 8 | SH 36 SUPER 2 CR 123 TO CALLAHAN COUNTY | TAYLOR | 2025-05-02 | $10,883,336.22 | $10,612,470.66 |
| Rank 5of 6 | SAFETY_MIDLAND_TEXAS_AVE_A_ST_C_ST | MIDLAND | 2025-05-02 | $1,729,128.35 | $1,295,425.35 |
| Rank 2of 6 | US285_0.7MI_N_GOMEZ_RD_1.8 MI N IH 10 | PECOS | 2025-04-03 | $28,265,792.58 | $26,858,499.32 |
| Rank 3of 6 | SH 350 BRIDGE AT I-20 | HOWARD | 2025-03-04 | $15,472,573.95 | $14,287,269.77 |
| Rank 4of 5 | US 84 0053-08 N OF FM 1611 TO AVE E WB | SCURRY | 2025-02-07 | $9,869,189.08 | $8,390,975.64 |
| Rank 4of 6 | 0140-13-020 IH 10 ACP OVERLAY | CROCKETT | 2025-02-06 | $28,182,975.42 | $24,564,336.71 |
| Rank 6of 7 | SH_115_WINKLER_COUNTY_REHAB | WINKLER | 2025-02-06 | $3,859,621.97 | $2,658,948.35 |
| Rank 7of 8 | 0907-13-017 CR REPLACE BRIDGE AND APPROA | RUNNELS | 2025-01-08 | $3,402,059.26 | $1,997,088.90 |
| Rank 2of 4 | US67_REAGAN_C/L_E_OF_CR225 | UPTON | 2025-01-08 | $13,893,001.14 | $13,723,465.92 |
| Low bidof 3 | 0069-04-047 US 87 Sterling Co. Seal Coat | STERLING | 2025-01-07 | $22,843,598.24 | $22,843,598.24 |
| Rank 3of 9 | PREVENTIVE MAINTENANCE | SHACKELFORD | 2024-12-04 | $5,926,417.10 | $5,659,269.00 |
| Rank 3of 3 | GRADING, BASE, PAVING, STORM SEWER, TRAFFIC SIGNAL | CONCHO | 2024-11-07 | $16,913,435.61 | $14,120,524.72 |
| Rank 4of 5 | WIDEN ROAD - ADD SHOULDERS | NOLAN | 2024-11-06 | $9,586,691.30 | $7,895,450.24 |
| Low bidof 2 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T | TOM GREEN | 2024-11-06 | $3,735,644.55 | $3,735,644.55 |
| Rank 4of 5 | BRIDGE REPLACEMENT | NOLAN | 2024-10-02 | $9,641,390.61 | $7,087,905.47 |
| Rank 2of 4 | RESURFACE ROADWAY | HOWARD | 2024-10-01 | $8,887,039.43 | $7,656,688.52 |
| Rank 5of 8 | PREVENTIVE MAINTENANCE | JONES | 2024-09-05 | $7,981,531.60 | $6,794,417.72 |
| Rank 2of 5 | BRIDGE REPLACEMENT | CROCKETT | 2024-09-05 | $6,571,416.74 | $5,673,708.11 |
| Rank 5of 5 | PREVENTIVE MAINTENANCE | IRION | 2024-08-02 | $69,927,828.14 | $52,231,940.64 |
| Low bidof 1 | ASPHALT | CONCHO | 2024-05-03 | $4,696,973.48 | $4,696,973.48 |
| Low bidof 2 | ASPHALT | TOM GREEN | 2024-04-04 | $2,383,456.90 | $2,383,456.90 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.