Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
208 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 8 | CR 308 Bridge Replacement HBP | JIM WELLS | 2026-06-03 | $1,051,569.75 | $877,584.50 |
| Rank 2of 10 | Lazy F RD(CR101) | GOLIAD | 2026-06-03 | $969,387.20 | $825,294.90 |
| Rank 10of 10 | SAT_US0281_3 | ATASCOSA | 2026-06-03 | $1,688,982.86 | $1,035,227.75 |
| Rank 4of 7 | FM 466: 0216-03-034; IOI | GUADALUPE | 2026-06-02 | $3,149,441.66 | $2,728,901.52 |
| Rank 6of 7 | FM1472 Concrete PVMT | WEBB | 2026-06-02 | $3,595,756.96 | $2,951,706.36 |
| Rank 5of 10 | CR 230 Bridge Replacement HBP | KARNES | 2026-06-02 | $934,780.13 | $817,324.60 |
| Rank 7of 7 | SH 90 at FM 244 - Turn Lane FY 26 | GRIMES | 2026-06-02 | $1,708,700.71 | $1,241,182.50 |
| Rank 5of 9 | US 183 MILLS C/L TO LOMETA | LAMPASAS | 2026-06-02 | $5,040,963.50 | $4,510,687.98 |
| Rank 6of 17 | FM 1107; 1271-01-013; BR | WILSON | 2026-05-07 | $1,138,652.03 | $948,874.50 |
| Rank 7of 8 | SH 29 from RM 1174 to WILLIAMSON CO LINE | BURNET | 2026-05-06 | $13,076,969.51 | $10,910,071.81 |
| Rank 8of 13 | PostOakRD Goliad At Manahuilla Cr Bridge | GOLIAD | 2026-05-06 | $1,334,440.40 | $1,135,007.50 |
| Rank 9of 10 | FM 72 at Spring Creek Bridge | IRION | 2026-05-06 | $7,656,518.31 | $4,405,520.94 |
| Rank 7of 8 | FM 969 from Utley Rd to Howard Ln | BASTROP | 2026-05-06 | $3,785,605.87 | $3,189,428.56 |
| Rank 8of 8 | FM 1456 REHABILITATE ROADWAY HSIP 2605 | AUSTIN | 2026-05-06 | $3,659,349.50 | $2,587,895.46 |
| Rank 3of 7 | RM 473; 0142-09-049; SFT | KENDALL | 2026-05-06 | $4,250,503.37 | $4,095,968.43 |
| Rank 5of 6 | RM 12 - US 290 to Travis C/L | HAYS | 2026-04-08 | $12,335,104.31 | $10,020,820.30 |
| Rank 4of 5 | LA PALOMA RD AT GALLINA SLOUGH | ZAVALA | 2026-04-07 | $1,857,166.67 | $1,523,015.88 |
| Rank 3of 3 | FM 531 SAFETY IMPROVEMENT 2606 | LAVACA | 2026-04-07 | $3,436,733.26 | $2,566,088.85 |
| Rank 6of 7 | US 90A 2022 HSIP | LAVACA | 2026-02-04 | $2,867,803.00 | $2,212,468.60 |
| Rank 4of 10 | RM 150 at Onion Creek Double Crossings | HAYS | 2026-01-07 | $1,229,049.75 | $999,084.54 |
| Low bidof 8 | TPW Project - Chaparral WMA | LA SALLE | 2026-01-07 | $714,669.37 | $714,669.37 |
| Rank 5of 6 | REHABILITATE ROADWAY 2709 | FAYETTE | 2026-01-06 | $5,046,119.01 | $4,335,114.43 |
| Rank 6of 10 | CR 281 BRIDGE REPLACEMENT 2609 | LAVACA | 2026-01-06 | $1,387,999.30 | $1,153,909.71 |
| Rank 3of 8 | FM 1115 BRIDGE REPLACEMENT 2305 | FAYETTE | 2025-12-03 | $1,514,169.40 | $1,375,081.21 |
| Rank 4of 8 | FM 239 BRIDGE REPLACEMENT 2307 | DE WITT | 2025-12-03 | $1,095,395.52 | $883,521.20 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.