Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
256 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 6 | FY'26 Pothole Repair | KAUFMAN | 2026-09-09 | $1,083,320.00 | $301,500.00 |
| Low bidof 6 | SH 360; Arkansas Ln to SH 180 | TARRANT | 2026-09-03 | $4,581,050.10 | $4,581,050.10 |
| Rank 2of 7 | US 287; FM 157 to Heritage Pkwy | TARRANT | 2026-09-02 | $2,832,085.34 | $2,623,266.87 |
| Rank 3of 7 | FY27, Flexible Pavement, Parker | PARKER | 2026-08-20 | $895,863.00 | $718,745.60 |
| Low bidof 7 | Flexible Pavement Repair Denton CO FY 26 | DENTON | 2026-08-12 | $662,133.21 | $662,133.21 |
| Low bidof 6 | Flexible Pavement 2933 08.2026 | COLLIN | 2026-08-12 | $501,226.67 | $501,226.67 |
| Rank 5of 5 | SH 79, FM 2224 to 1.7 miles south | ARCHER | 2026-08-06 | $15,980,022.84 | $13,042,633.07 |
| Low bidof 4 | SH 183; SH 157 to Bear Creek Blvd | TARRANT | 2026-08-06 | $698,180.60 | $698,180.60 |
| Low bidof 5 | SH 121 FR from Hickory Dr. to Hickory Dr | TARRANT | 2026-08-06 | $3,202,525.20 | $3,202,525.20 |
| Low bidof 8 | IH 35W; N of Woodbine Dr to S of CR 530B | JOHNSON | 2026-08-05 | $2,800,123.52 | $2,800,123.52 |
| Rank 2of 7 | SH 34 IH 20 EB to N of SH 243 | KAUFMAN | 2026-08-05 | $6,445,185.94 | $6,242,701.42 |
| Rank 2of 4 | FY 26 Flex Pave Repair | ROCKWALL | 2026-07-08 | $1,381,309.75 | $1,174,731.82 |
| Low bidof 6 | SH 289 from SL 12 to IH 635 | DALLAS | 2026-07-02 | $5,963,494.65 | $5,963,494.65 |
| Rank 2of 2 | Sept 26-Aug 27 Conc Full Depth Repair | TARRANT | 2026-07-02 | $5,246,270.00 | $4,900,925.00 |
| Rank 4of 7 | SH 171; Willingham St to FM 1718 | JOHNSON | 2026-07-02 | $2,122,024.00 | $1,879,034.47 |
| Low bidof 4 | CS; Las Vegas Trl fr Quebec Dr to IH 820 | TARRANT | 2026-07-01 | $5,160,281.79 | $5,160,281.79 |
| Rank 6of 9 | FM 3039: S of Hunter Ln to S of W Lewis | KAUFMAN | 2026-07-01 | $789,378.15 | $598,150.10 |
| Rank 4of 9 | FM 1461 from CR 123 to Franklin Branch | COLLIN | 2026-07-01 | $4,836,111.78 | $4,381,938.02 |
| Rank 4of 7 | BUS 287 Fr Bailey Boswell To Bonds Ranch | TARRANT | 2026-07-01 | $9,778,196.17 | $8,547,147.17 |
| Rank 3of 6 | FY27, Flexible Pavement, N. Tarrant | TARRANT | 2026-07-01 | $6,619,611.50 | $6,134,750.00 |
| Rank 5of 7 | FM 1884; Fr South of Fleet St to EOSM | PARKER | 2026-06-03 | $6,829,463.65 | $5,970,809.71 |
| Rank 2of 8 | SS 341; From Bolliger Blvd to Scott St. | TARRANT | 2026-06-03 | $1,524,805.10 | $1,490,460.71 |
| Rank 2of 6 | FY26, Flexible Pavement, Jack & Wise | WISE | 2026-06-03 | $6,239,577.69 | $5,864,828.05 |
| Rank 3of 8 | SH 174; Wicker Hill to Elk Dr | JOHNSON | 2026-06-02 | $20,530,952.76 | $19,812,334.00 |
| Low bidof 9 | FM 920; From College St to RWMH | PARKER | 2026-06-02 | $8,486,108.01 | $8,486,108.01 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.