Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
19 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 5 | BRIDGE MAINTENANCE | HARRISON | 2022-02-04 | $639,848.46 | $639,848.46 |
| Rank 4of 9 | SAFETY TREAT FIXED OBJECTS | BOWIE | 2021-06-03 | $1,758,464.90 | $1,493,307.90 |
| Rank 3of 7 | BRIDGE MAINTENANCE | HARRISON | 2021-05-06 | $706,665.10 | $692,721.00 |
| Rank 5of 9 | SAFETY TREAT FIXED OBJECTS | CASS | 2021-04-07 | $2,973,493.84 | $2,714,170.77 |
| Low bidof 13 | SAFETY TREAT FIXED OBJECTS | MARION | 2021-02-04 | $856,032.51 | $856,032.51 |
| Low bidof 9 | CONSTRUCTION OF A NEW 2-LANE ROADWAY | CAMP | 2021-01-07 | $5,634,658.36 | $5,634,658.36 |
| Rank 3of 5 | BRIDGE RAIL REPAIR | GREGG | 2020-12-08 | $74,238.30 | $39,735.00 |
| Rank 3of 7 | REHABILITATION OF EXISTING ROAD | HOPKINS | 2020-11-05 | $4,556,565.86 | $4,389,010.57 |
| Rank 3of 11 | INSTALL MEDIAN BARRIER | CASS | 2020-11-04 | $4,986,345.55 | $4,434,952.65 |
| Rank 3of 4 | WIDEN 2 LN ROAD TO 4 LANE DIVIDED ROADWAY W/FLUSH | GREGG | 2020-08-05 | $13,567,635.42 | $13,220,500.13 |
| Rank 2of 6 | REPLACE BRIDGES AND APPROACHES | BOWIE | 2020-06-05 | $4,065,123.47 | $3,919,948.80 |
| Rank 5of 8 | IMPROVE DRAINAGE, CULVERTS AND UPGRADE GUARD RAIL | GREGG | 2020-04-08 | $4,433,034.00 | $3,889,930.50 |
| Rank 5of 12 | SAFETY TREAT FIXED OBJECTS | HARRISON | 2020-03-04 | $2,017,609.00 | $1,847,139.90 |
| Low bidof 6 | CONCRETE STRUCTURE REPAIR AND JOINT CLEANING | HARRISON | 2019-08-06 | $329,387.00 | $329,387.00 |
| Rank 3of 8 | IMPROVE DRAINAGE, UPGRADE GUARD RAIL | SMITH | 2019-04-03 | $829,822.04 | $799,066.29 |
| Rank 2of 8 | CONCRETE CURB AND FLUME | HUNT | 2019-02-14 | $202,619.25 | $196,127.75 |
| Low bidof 6 | GUARDRAIL | VAN ZANDT | 2019-02-12 | $265,677.64 | $265,677.64 |
| Rank 3of 4 | CALLOUT CABLE SAFETY SYSTEM REPAIR | HARRISON | 2018-04-11 | $318,650.00 | $239,895.60 |
| Rank 10of 12 | BRIDGE PREVENTIVE MAINTENANCE | GREGG | 2018-02-06 | $226,846.90 | $167,859.50 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.