Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
252 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 11of 11 | BRIDGE PREVENTIVE MAINTENANCE | GUADALUPE | 2017-04-12 | $468,739.72 | $270,769.97 |
| Rank 3of 8 | SAFETY TREAT FIXED OBJECTS | CALDWELL | 2017-04-05 | $1,285,169.08 | $986,625.98 |
| Rank 4of 8 | INSTALL CONTINUOUS TURN LANE | GILLESPIE | 2017-04-04 | $1,092,960.52 | $963,063.11 |
| Rank 9of 9 | EXPAND 2 TO 4 LNS W/ LTL, SW, BK LN & EXTEND RDWY | BEXAR | 2017-03-08 | $9,940,958.95 | $7,388,905.60 |
| Rank 3of 4 | ACP OVERLAY | DEWITT | 2017-03-08 | $2,069,011.20 | $1,812,578.62 |
| Rank 3of 6 | ACP OVERLAY | GONZALES | 2017-03-07 | $16,311,009.94 | $14,770,182.68 |
| Rank 2of 4 | WIDEN ROADWAY | DEWITT | 2017-02-03 | $3,058,795.87 | $3,015,734.94 |
| Rank 5of 5 | REHAB EXISTING ROADWAY | COMAL | 2017-02-03 | $3,954,846.96 | $3,011,597.60 |
| Rank 5of 6 | OVERLAY & PAVEMENT MARKINGS ON NB & SB FRONTAGE RD | BEXAR | 2017-02-03 | $4,250,936.94 | $3,248,620.98 |
| Rank 2of 6 | REALIGN INTERSECTION | BASTROP | 2017-02-02 | $296,620.01 | $286,003.25 |
| Low bidof 7 | REPAIR AND OVERLAY | HAYS | 2017-02-02 | $2,315,707.10 | $2,315,707.10 |
| Rank 5of 7 | BRIDGE REPLACEMENTS,BASE,SURFACING | DIMMIT | 2017-02-02 | $5,609,224.81 | $4,902,990.18 |
| Rank 4of 6 | REHAB/WIDEN RDWY TO PROVIDE PASS LANES & OP IMPROV | WILSON | 2017-01-05 | $20,176,302.55 | $18,593,935.69 |
| Rank 2of 7 | CONSTRUCT AUXILIARY LANES | DEWITT | 2017-01-05 | $10,960,098.02 | $10,180,818.69 |
| Rank 4of 6 | REPLACE BRIDGE AND APPROACHES | FAYETTE | 2017-01-05 | $676,385.80 | $519,583.10 |
| Rank 5of 6 | LENGTHEN LEFT TURN LANE | BASTROP | 2017-01-05 | $341,961.78 | $286,525.30 |
| Rank 6of 11 | REPLACE BRIDGE AND APPROACHES | DEWITT | 2017-01-04 | $510,362.17 | $449,866.88 |
| Rank 3of 8 | BASE REPAIR, SURFACE AND RESTRIPE ROADWAY | KARNES | 2017-01-04 | $5,520,600.82 | $5,186,387.04 |
| Rank 3of 7 | REPAIR AND OVERLAY | HAYS | 2017-01-04 | $1,113,697.64 | $1,037,967.60 |
| Rank 4of 7 | PAVEMENT REPAIR AND RESURFACING | GONZALES | 2016-12-01 | $4,201,616.97 | $3,460,417.80 |
| Rank 5of 8 | WIDEN BRIDGE AND APPROACHES | FAYETTE | 2016-12-01 | $1,228,572.85 | $831,842.18 |
| Rank 2of 9 | SOIL STABILIZATION AND RIPRAP | FAYETTE | 2016-12-01 | $782,290.48 | $781,891.40 |
| Rank 4of 11 | REPLACE BRIDGE AND APPROACHES | GONZALES | 2016-11-04 | $1,487,868.49 | $1,222,090.60 |
| Rank 6of 9 | REMOVE AND REPLACE MBGF | BEXAR | 2016-11-04 | $653,595.57 | $568,940.00 |
| Low bidof 4 | PAVEMENT REPAIR AND RESURFACING | DEWITT | 2016-11-03 | $1,750,008.32 | $1,750,008.32 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.