Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
89 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 14 | US 79 - At Drain (BMIP24) | WILLIAMSON | 2026-10-06 | $563,640.20 | $344,329.00 |
| Rank 10of 14 | FY 26 FUA - AUS BR Maint | TRAVIS | 2026-03-05 | $2,131,288.90 | $1,606,502.00 |
| Rank 9of 13 | BAAO/SAAO Bridge FUA Bridge Repairs | TRAVIS | 2026-03-05 | $593,414.79 | $327,386.00 |
| Rank 6of 13 | GTAO/NAAO Bridge FUA Repairs | TRAVIS | 2026-03-04 | $1,111,782.63 | $769,928.00 |
| Rank 3of 7 | FY26 - SH 19 SB Bridge Repair | WALKER | 2026-02-10 | $79,671.00 | $57,501.00 |
| Rank 9of 10 | SH 16 - AT Oatman Crk - 25BMIP | LLANO | 2025-03-05 | $2,906,996.89 | $2,089,129.10 |
| Rank 9of 19 | FM 2571 - AT Gazley Crk - 25 BMIP | BASTROP | 2025-03-04 | $250,273.00 | $180,204.00 |
| Rank 13of 14 | Atascosa Bridge Preventative Maint | ATASCOSA | 2025-02-20 | $172,630.00 | $67,357.00 |
| Rank 4of 5 | LP 1 - 25BMIP | TRAVIS | 2025-02-07 | $756,748.35 | $720,110.11 |
| Rank 8of 13 | US 290 - At Cottonwd & B Dry Ck, 25BMIP | TRAVIS | 2025-02-06 | $385,095.00 | $304,980.00 |
| Rank 4of 10 | SH 29 - AT San Gabriel Rv, 25BMIP | WILLIAMSON | 2025-02-06 | $462,899.50 | $279,317.00 |
| Rank 5of 6 | 6476-84-001 Conc. Struc. Repair | LIVE OAK | 2025-01-14 | $1,046,340.00 | $456,790.00 |
| Rank 5of 5 | BRIDGE MAINTENANCE | WILLIAMSON | 2024-04-05 | $363,608.70 | $234,700.00 |
| Rank 4of 8 | BRIDGE PREVENTATIVE MAINTENANCE | BASTROP | 2024-03-05 | $665,431.75 | $468,690.00 |
| Rank 6of 6 | BRIDGE REPAIR | TRAVIS | 2023-05-04 | $649,365.00 | $406,975.00 |
| Rank 3of 9 | RIPRAP REPAIR AND BRIDGE RAILING | BLANCO | 2022-08-03 | $592,850.00 | $515,420.00 |
| Low bidof 2 | BRIDGE REPAIR | TRAVIS | 2022-03-03 | $1,429,650.00 | $1,429,650.00 |
| Low bidof 3 | BRIDGE REPAIR | TRAVIS | 2022-03-03 | $1,558,775.00 | $1,558,775.00 |
| Rank 2of 4 | CONCRETE STRUCTURE REPAIR | TAYLOR | 2022-02-03 | $1,327,500.00 | $982,526.00 |
| Rank 6of 6 | BRIDGE PREVENTATIVE MAINTENANCE | SAN PATRICIO | 2021-11-16 | $381,039.25 | $239,349.55 |
| Rank 2of 6 | BRIDGE PREVENTATIVE MAINTENANCE | HASKELL | 2021-11-03 | $590,591.00 | $523,856.50 |
| Rank 2of 4 | BRIDGE MAINTENANCE | TAYLOR | 2021-10-08 | $604,862.00 | $574,730.00 |
| Rank 4of 6 | CULVERT REPAIR | CHILDRESS | 2021-10-08 | $493,500.00 | $397,750.00 |
| Rank 4of 4 | BRIDGE REPAIR | MADISON | 2021-10-07 | $450,852.50 | $320,869.85 |
| Rank 2of 8 | SCOUR AND EROSION CONTROL | CALDWELL | 2021-09-02 | $734,172.54 | $675,857.89 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.