Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
50 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 6 | US60-FM1172 to Castro CL FY27 HSIP | PARMER | 2026-10-06 | $2,289,410.39 | $1,696,791.55 |
| Low bidof 5 | CRP_US 181_TAR_CableBarrier_2027 | BEE | 2026-09-03 | $1,866,376.62 | $1,866,376.62 |
| Rank 10of 11 | FY 2027 Guardrail | PARKER | 2026-09-02 | $5,261,752.81 | $3,643,030.50 |
| Rank 2of 5 | HSIP Systemic Median Barrier | WISE | 2026-08-05 | $1,250,876.95 | $1,237,814.41 |
| Rank 3of 4 | FY27 - Grimes Co BPM - 07 | GRIMES | 2026-07-14 | $577,064.90 | $487,782.00 |
| Rank 4of 5 | 0070-03-062 US 87 CABLE BARRIER | CONCHO | 2026-07-01 | $3,017,028.33 | $2,660,738.00 |
| Rank 4of 6 | FY27 - Washington Co BPM -06 | WASHINGTON | 2026-06-11 | $761,412.83 | $546,000.00 |
| Rank 12of 12 | Cooke County chevrons | COOKE | 2026-06-03 | $1,729,240.50 | $847,121.75 |
| Rank 6of 6 | US 287 SAFETY LIGHTING 1/1 | ARMSTRONG | 2026-06-02 | $9,923,821.72 | $6,922,965.90 |
| Low bidof 4 | SH 36 INSTALL MEDIAN BARRIERS 2605 | AUSTIN | 2026-05-07 | $559,612.36 | $559,612.36 |
| Rank 4of 7 | US 69_FM 1270 to Jasper County Line | ANGELINA | 2026-03-04 | $1,800,962.95 | $1,511,792.00 |
| Rank 3of 7 | CRP_US0181_Bee_HSIP | BEE | 2026-03-04 | $2,301,367.95 | $1,569,681.00 |
| Rank 7of 9 | SL 281 from Gregg CL to IH 20 | HARRISON | 2026-02-05 | $1,923,296.42 | $1,619,890.45 |
| Rank 4of 12 | SH 16: 0613-01-072: SFT | BEXAR | 2025-11-05 | $1,211,105.72 | $1,129,625.96 |
| Rank 3of 8 | BMT_US0096_4 (2022 HSIP) MEDIAN BARRIERS | JASPER | 2025-10-08 | $1,194,027.74 | $989,115.00 |
| Rank 7of 9 | US 83 - Median Barrier | HIDALGO | 2025-09-04 | $968,290.74 | $734,476.11 |
| Rank 4of 7 | AUS_US290(HSIP23) | BLANCO | 2025-07-02 | $858,777.48 | $610,125.00 |
| Rank 7of 8 | San Patricio US 181 cable barrier | SAN PATRICIO | 2025-05-01 | $856,956.45 | $584,654.00 |
| Rank 4of 6 | US 83 - 1 - 1/1 | TAYLOR | 2025-04-04 | $861,445.62 | $493,190.20 |
| Low bidof 5 | HAZARD ELIMINATION & SAFETY | MITCHELL | 2024-11-07 | $1,243,855.77 | $1,243,855.77 |
| Rank 3of 4 | HAZARD ELIMINATION & SAFETY | POLK | 2024-08-02 | $6,737,501.53 | $5,472,431.47 |
| Rank 3of 5 | INSTALL CABLE MEDIAN BARRIER | BRAZOS | 2024-08-02 | $1,928,134.50 | $1,348,041.00 |
| Rank 4of 5 | INSTALL RAISED MEDIAN | PARKER | 2024-08-02 | $1,404,160.26 | $1,239,439.77 |
| Low bidof 4 | INSTALL RAISED MEDIAN | HOOD | 2024-08-01 | $941,155.73 | $941,155.73 |
| Rank 11of 11 | HAZARD ELIMINATION & SAFETY | LIBERTY | 2024-08-01 | $2,586,479.73 | $1,654,702.80 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.