Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
67 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 7 | SH 11 from US 259 to Cass C/L | MORRIS | 2026-08-05 | $12,846,197.94 | $10,759,104.58 |
| Rank 3of 4 | FM 123 from US 79 to FM 31S | PANOLA | 2026-07-01 | $2,695,990.19 | $2,441,151.06 |
| Low bidof 5 | FM3016_FROM FM 228 TO CR 1685 | HOUSTON | 2026-07-01 | $3,814,102.44 | $3,814,102.44 |
| Rank 3of 9 | FM 227_FROM FM 2544 TO 3.3 MI EAST | HOUSTON | 2026-06-03 | $4,944,495.69 | $4,462,648.02 |
| Rank 7of 9 | FM 2259_SH 7 TO 2.55 MI S. OF SH 7 | NACOGDOCHES | 2026-05-06 | $6,166,004.18 | $5,074,603.77 |
| Rank 5of 8 | FM1251,CR394-PANOLAC/L,WDN | RUSK | 2026-04-07 | $9,760,583.91 | $8,734,907.66 |
| Rank 5of 5 | SH64,CR4133-SL571,HSIP2025 | RUSK | 2026-01-06 | $15,103,708.70 | $13,629,477.94 |
| Rank 5of 5 | SH 49 at FM 2348 | TITUS | 2025-10-08 | $1,229,347.22 | $1,096,364.98 |
| Low bidof 9 | SH 49 from SH 155 to Marion C/L | CASS | 2025-10-08 | $11,029,939.11 | $11,029,939.11 |
| Rank 4of 6 | FM 2076_EOP to FM 229 (RES) | HOUSTON | 2025-08-08 | $10,716,478.59 | $9,900,198.38 |
| Rank 4of 13 | FM 855, US 69-US 175, SFTY | CHEROKEE | 2025-08-08 | $4,986,544.14 | $4,101,438.93 |
| Rank 3of 4 | US 259, BU 259-FM850,HSIP 2025 | RUSK | 2025-08-07 | $2,996,013.18 | $2,495,223.84 |
| Rank 11of 11 | SH 43 from Rusk CL to Harrison CL | PANOLA | 2025-07-02 | $3,860,109.73 | $2,328,377.27 |
| Rank 5of 7 | US79,RUSKC/L-SH110,RRR | CHEROKEE | 2025-02-07 | $5,575,648.44 | $4,258,941.26 |
| Rank 3of 4 | FM 947_W of FM 2695 to FM 2695 - HES | SHELBY | 2025-01-07 | $6,482,418.82 | $5,239,176.28 |
| Rank 6of 6 | WIDEN ROAD - ADD SHOULDERS | CASS | 2024-12-04 | $2,667,259.36 | $1,327,253.73 |
| Rank 2of 2 | HAZARD ELIMINATION & SAFETY | SMITH | 2023-04-05 | $1,610,972.00 | $1,235,384.00 |
| Rank 4of 5 | RESURFACE ROADWAY | GREGG | 2023-02-02 | $13,997,990.17 | $12,569,410.61 |
| Rank 2of 5 | REHABILITATE EXISTING ROADWAY | CHEROKEE | 2023-01-06 | $3,447,826.74 | $3,018,317.59 |
| Rank 2of 5 | WIDEN ROAD - ADD LANES | RUSK | 2023-01-05 | $2,844,078.47 | $2,429,718.64 |
| Rank 4of 4 | HAZARD ELIMINATION & SAFETY | GREGG | 2023-01-05 | $374,800.00 | $224,591.52 |
| Rank 3of 11 | BRIDGE PREVENTATIVE MAINTENANCE | RUSK | 2022-10-06 | $569,220.00 | $471,298.00 |
| Low bidof 4 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T | SMITH | 2022-08-03 | $2,208,247.24 | $2,208,247.24 |
| Rank 3of 6 | CROSS DRAINAGE STRUCTURE REPAIR | CHEROKEE | 2022-04-06 | $429,944.42 | $399,000.33 |
| Rank 10of 10 | REPLACE BRIDGE AND APPROACHES | HARRISON | 2022-03-04 | $989,803.00 | $481,045.30 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.