Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
272 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 8 | SH 279_2of2 PR15 to Shamrock Dr. | BROWN | 2025-05-02 | $2,846,856.64 | $1,732,353.00 |
| Rank 6of 10 | SFT | Districtwide Green Signs Project | MCLENNAN | 2025-05-01 | $2,124,561.69 | $1,843,383.70 |
| Rank 2of 6 | US 83 - 1 - 1/1 | TAYLOR | 2025-04-04 | $734,197.00 | $493,190.20 |
| Rank 2of 6 | IH 27 South Large Sign Replacements | POTTER | 2025-04-03 | $1,816,568.54 | $1,712,643.68 |
| Rank 4of 5 | MBGF Repair North FY 26 | TOM GREEN | 2025-03-11 | $870,843.00 | $505,853.00 |
| Rank 8of 9 | IH10 MBGF (FM 659 | FM 1281) | EL PASO | 2025-03-04 | $451,324.00 | $276,338.00 |
| Rank 3of 6 | FY 25 Amarillo Area Cable Barrier | POTTER | 2025-02-27 | $331,366.00 | $259,524.00 |
| Rank 3of 6 | Pampa Area Cable Barrier Repair | CARSON | 2025-02-27 | $331,366.00 | $259,524.00 |
| Rank 5of 7 | MBGF REPAIR (CALLOUT) | BROWN | 2025-02-06 | $1,911,715.00 | $1,320,359.00 |
| Rank 3of 4 | FY25 MBGF Repair | CHILDRESS | 2025-01-15 | $480,000.00 | $331,022.00 |
| Low bidof 4 | US 287 Moore Co Cable Median Barrier - 2 | MOORE | 2025-01-08 | $5,565,020.45 | $5,565,020.45 |
| Rank 4of 5 | FY 24 RR Signs & Striping Various Locati | LUBBOCK | 2025-01-07 | $1,146,220.00 | $751,868.00 |
| Rank 10of 10 | US 84 Stuart St. 0.21 MI S Loop 15 | MILLS | 2025-01-07 | $1,164,165.00 | $325,100.00 |
| Rank 7of 7 | HAZARD ELIMINATION & SAFETY | WISE | 2024-12-04 | $248,300.00 | $149,400.00 |
| Rank 2of 5 | HAZARD ELIMINATION & SAFETY | MITCHELL | 2024-11-07 | $1,265,412.75 | $1,243,855.77 |
| Rank 9of 11 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S) | STEPHENS | 2024-11-06 | $689,936.55 | $501,898.98 |
| Low bidof 7 | CABLE MEDIAN BARRIER SYSTEM REPAIR | ECTOR | 2024-10-08 | $363,685.00 | $363,685.00 |
| Rank 2of 7 | CABLE MEDIAN BARRIER SYSTEM REPAIR | MIDLAND | 2024-10-08 | $465,815.00 | $463,943.00 |
| Rank 5of 7 | HIGHWAY IMPROVEMENT | PARKER | 2024-10-01 | $13,286,728.00 | $10,713,976.55 |
| Rank 3of 5 | INSTALL/REPLACE SIGNS | CHILDRESS | 2024-10-01 | $1,897,563.30 | $1,519,265.56 |
| Rank 2of 3 | CABLE BARRIER REPAIR | WHEELER | 2024-09-03 | $152,000.00 | $140,644.00 |
| Low bidof 1 | SURFACING/ROADWAY RESTORATION | EASTLAND | 2024-08-02 | $4,787,222.92 | $4,787,222.92 |
| Low bidof 5 | INSTALL RAISED MEDIAN | PARKER | 2024-08-02 | $1,239,439.77 | $1,239,439.77 |
| Rank 4of 4 | INSTALL RAISED MEDIAN | HOOD | 2024-08-01 | $1,359,752.67 | $941,155.73 |
| Rank 6of 11 | HAZARD ELIMINATION & SAFETY | LIBERTY | 2024-08-01 | $1,899,999.30 | $1,654,702.80 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.