Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
104 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 3 | SIGNING AND PAVEMENT MARKINGS | HARRIS | 2020-03-04 | $1,098,420.41 | $776,518.97 |
| Low bidof 2 | INSTALL OSB | BEXAR | 2020-03-04 | $659,593.70 | $659,593.70 |
| Low bidof 4 | REPLACE SIGN BRIDGE | TAYLOR | 2020-01-16 | $184,153.30 | $184,153.30 |
| Low bidof 4 | INSTALL/REPLACE SIGNS | TARRANT | 2019-11-05 | $362,740.07 | $362,740.07 |
| Rank 2of 4 | TRAFFIC CONTROL DEVICES | TARRANT | 2019-09-05 | $864,087.25 | $753,806.24 |
| Rank 2of 7 | INSTALL HIGH MAST LIGHTING | HARRIS | 2019-08-07 | $9,889,842.90 | $9,799,999.16 |
| Low bidof 7 | UPGRADE HIGH MAST ILLUMINATION | HARRIS | 2019-06-04 | $3,258,510.85 | $3,258,510.85 |
| Rank 3of 4 | INSTALL ITS EQUIPMENT & INFRASTRUCTURE | HARRIS | 2019-05-07 | $4,366,727.41 | $3,339,515.66 |
| Rank 4of 6 | INSTALL GUIDE SIGNS | DALLAS | 2019-05-07 | $1,285,946.56 | $1,008,154.51 |
| Rank 4of 5 | SAFETY LIGHTING | WICHITA | 2019-01-09 | $1,372,110.92 | $1,090,136.60 |
| Rank 4of 4 | ITS EQUIPMENT | LUBBOCK | 2018-10-02 | $1,019,713.75 | $721,754.07 |
| Low bidof 3 | INSTALL ITS FIBER & EQUIPMENT | TARRANT | 2018-08-07 | $3,458,299.91 | $3,458,299.91 |
| Rank 3of 3 | UPGRADE ILLUMINATION | BEXAR | 2018-07-10 | $6,576,928.60 | $6,167,909.34 |
| Rank 2of 7 | INSTALL HIGH MAST LIGHTING | ORANGE | 2018-07-10 | $15,282,427.30 | $15,083,451.78 |
| Rank 3of 5 | INTERSTATE SIGN MAINTENANCE | TARRANT | 2018-06-06 | $612,469.07 | $532,448.70 |
| Rank 3of 8 | UPGRADE ILLUMINATION | HARRIS | 2018-06-05 | $2,959,638.49 | $2,743,512.99 |
| Low bidof 6 | HIGH MAST AND CONTINUOUS ILLUMINATION | BEXAR | 2018-05-02 | $1,310,012.92 | $1,310,012.92 |
| Rank 3of 8 | SAFETY LIGHTING | JOHNSON | 2018-05-01 | $482,355.66 | $459,534.39 |
| Rank 2of 5 | DISTRICTWIDE GUIDESIGNS FY18 | BEXAR | 2018-04-04 | $2,028,509.92 | $1,921,528.61 |
| Low bidof 3 | GUIDE SIGN INSTALLATION & DMS REHABILITATION | DALLAS | 2018-04-04 | $865,310.51 | $865,310.51 |
| Rank 2of 3 | INSTALL ITS DYNAMIC GUIDE SIGNS/DMS MESSAGE BOARDS | BEXAR | 2018-04-03 | $3,605,238.96 | $2,897,980.50 |
| Rank 3of 8 | SIGN UPGRADE | WICHITA | 2018-03-06 | $521,660.69 | $497,863.80 |
| Rank 3of 3 | ILLUMINATION REFURBISHMENT | TARRANT | 2017-08-09 | $3,870,005.90 | $2,906,756.94 |
| Rank 3of 5 | REPLACE WIRE/CONDUIT | TARRANT | 2017-08-09 | $539,605.09 | $485,156.99 |
| Rank 3of 3 | WIRELESS ITS | DALLAS | 2017-07-12 | $2,032,766.05 | $1,497,828.55 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.