Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
100 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 12of 13 | CROSS DRAIN STRUCTURES REPAIR OR REPLACEMENT | COLLIN | 2021-02-05 | $379,033.00 | $197,225.00 |
| Rank 12of 12 | BRIDGE REPLACEMENT | GRAYSON | 2021-02-04 | $651,750.00 | $334,514.50 |
| Rank 7of 8 | FULL DEPTH CONCRETE REPAIR | ROCKWALL | 2021-02-04 | $1,137,000.00 | $737,950.00 |
| Rank 6of 11 | BPM-ABUTMENT AND RIPRAP EROSION REPAIR | GRAYSON | 2020-12-17 | $194,777.77 | $137,293.00 |
| Rank 3of 8 | PREVENTIVE MAINTENANCE | GRAYSON | 2020-12-02 | $1,327,777.00 | $1,248,625.00 |
| Rank 8of 8 | BRIDGE DECK AND RAIL REPAIR | HUNT | 2020-11-19 | $299,777.00 | $155,950.00 |
| Rank 4of 10 | REMOVE/REPLACE BRIDGE RAIL | GRAYSON | 2020-10-02 | $1,544,077.77 | $1,354,337.45 |
| Rank 3of 4 | HAZARD ELIMINATION & SAFETY | GRAYSON | 2020-08-05 | $2,177,777.77 | $1,740,801.09 |
| Rank 5of 9 | CONSTRUCTION OF HAZARD ELIMINATION & SAFETY ON ML | DALLAS | 2020-07-08 | $3,160,406.70 | $2,753,152.00 |
| Rank 4of 5 | SAFETY TREAT FIXED OBJECTS | HOPKINS | 2020-05-08 | $4,229,777.00 | $2,754,447.02 |
| Rank 7of 8 | BPM-ABUTMENT & RIPRAP EROSION REPAIR | GRAYSON | 2020-04-16 | $410,805.00 | $264,124.00 |
| Rank 3of 5 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2020-04-14 | $287,777.00 | $224,979.96 |
| Rank 4of 9 | BPM-CONCRETE BEAM AND STRUCTURE REPAIR | HOPKINS | 2020-03-19 | $234,877.00 | $182,140.00 |
| Low bidof 5 | FULL DEPTH CONCRETE REPAIR | HOPKINS | 2020-02-07 | $1,777,711.00 | $1,777,711.00 |
| Low bidof 1 | BRIDGE AND CONCRETE REPAIR (CALL-OUT) | BROWN | 2019-12-19 | $608,600.00 | $608,600.00 |
| Low bidof 4 | REPAIR/REPLACE CONCRETE BARRIER | COLLIN | 2019-07-10 | $456,836.46 | $456,836.46 |
| Rank 3of 7 | BPM - BRIDGE JOINT REPAIR | DENTON | 2019-07-10 | $702,000.00 | $555,904.00 |
| Low bidof 3 | BRIDGE REPAIR AND FULL DEPTH CONCRETE REPAIR | GRAYSON | 2019-07-10 | $741,270.00 | $741,270.00 |
| Rank 5of 5 | REPAIR/REPLACE CONCRETE BARRIER | DALLAS | 2019-06-05 | $1,336,600.00 | $773,540.00 |
| Low bidof 4 | SIGS, CHEV, BR RAIL, GRDRL, MRKS | DALLAS | 2019-06-04 | $4,663,152.50 | $4,663,152.50 |
| Rank 2of 4 | REPAIR/REPLACE CONCRETE BARRIER | DALLAS | 2019-06-04 | $1,169,400.00 | $1,076,250.00 |
| Rank 7of 10 | INSTALL MEDIAN CONCRETE BARRIERS | DENTON | 2019-04-03 | $3,439,117.10 | $3,179,440.56 |
| Rank 4of 9 | REPLACE BRIDGE AND APPROACHES | DALLAS | 2019-04-02 | $983,712.50 | $793,042.00 |
| Rank 5of 7 | BPM - BRIDGE BEAM/DECK REPAIR | HOPKINS | 2019-03-21 | $251,620.00 | $197,280.00 |
| Rank 7of 7 | BPM - EROSION/RIPRAP REPAIR | HUNT | 2019-03-21 | $218,200.00 | $89,180.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.