Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
100 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | DITCH, GUARDRAIL & ATTENUATOR CLEANING | COLLIN | 2019-03-06 | $862,500.00 | $526,650.00 |
| Rank 4of 4 | BPM - BRIDGE REPAIR | ELLIS | 2019-02-12 | $412,708.70 | $198,227.20 |
| Rank 2of 7 | BRIDGE REPAIR | DALLAS | 2019-02-05 | $388,835.00 | $335,030.00 |
| Rank 4of 7 | BORE AND REPLACE PIPE | GRAYSON | 2019-02-05 | $828,680.00 | $680,118.50 |
| Rank 7of 7 | REHABILITATION OF EXISTING CULVERTS | COLLIN | 2018-12-05 | $723,302.00 | $417,037.00 |
| Rank 7of 9 | REMOVE & REPLACE DELINEATOR | WICHITA | 2018-10-17 | $271,787.00 | $156,949.00 |
| Rank 3of 9 | BRIDGE PREVENTATIVE MAINTENANCE | COOKE | 2018-10-03 | $737,030.04 | $661,891.50 |
| Rank 3of 4 | CONSTRUCT CURB RAMPS AND SIDEWALKS | DALLAS | 2018-09-07 | $3,217,998.00 | $2,237,635.19 |
| Rank 9of 9 | REPLACE BRIDGE AND APPROACHES | COLLIN | 2018-09-06 | $5,687,553.42 | $4,119,000.00 |
| Rank 2of 9 | HAZARD ELIMINATION & SAFETY | GRAYSON | 2018-08-07 | $3,470,620.00 | $3,461,445.00 |
| Rank 5of 7 | ABUTMENT EROSION REPAIR | LAMAR | 2018-07-11 | $812,325.00 | $587,100.00 |
| Rank 3of 5 | BRIDGE DECK REPAIR AND ABUT & BENT WORK | DALLAS | 2018-06-06 | $1,219,150.50 | $906,208.75 |
| Rank 10of 11 | HAZARD ELIMINATION & SAFETY | RED RIVER | 2018-06-05 | $4,317,588.40 | $2,961,890.31 |
| Rank 6of 7 | DRAINAGE IMPROVEMENT | GRAYSON | 2018-04-19 | $278,426.00 | $192,575.00 |
| Rank 7of 8 | HAZARD ELIMINATION & SAFETY | HUNT | 2018-04-04 | $2,590,811.36 | $1,784,029.22 |
| Rank 2of 5 | EROSION REPAIR-INSTALL SOIL NAIL RETAINING WALL | GRAYSON | 2018-04-03 | $688,502.00 | $629,000.00 |
| Rank 2of 8 | BRIDGE REPAIR | DALLAS | 2018-04-03 | $328,775.00 | $249,652.50 |
| Rank 11of 11 | BPM-ABUTMENT EROSION REPAIR | GRAYSON | 2018-03-22 | $167,049.00 | $95,594.00 |
| Rank 10of 10 | REPLACE CULVERTS AND IMPROVE DRAINAGE | GRAYSON | 2018-03-06 | $431,245.00 | $201,885.96 |
| Rank 3of 5 | SAFETY TREAT FIXED OBJECTS | GRAYSON | 2017-08-08 | $1,093,546.00 | $930,195.00 |
| Rank 4of 6 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2017-07-12 | $969,480.00 | $598,650.00 |
| Low bidof 4 | REPAIR/REPLACE CONCRETE BARRIER | COLLIN | 2017-07-12 | $382,036.46 | $382,036.46 |
| Low bidof 8 | SAFETY TREAT FIXED OBJECTS | FANNIN | 2017-02-02 | $3,186,550.00 | $3,186,550.00 |
| Rank 4of 6 | CULVERT EXTENSION/REPLACING | DENTON | 2016-11-04 | $526,512.00 | $402,160.00 |
| Rank 4of 5 | MISCELLANEOUS CONCRETE REPAIR | ROCKWALL | 2016-11-03 | $340,495.00 | $267,136.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.