Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
10 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | ELP_SL0375_1-SYS (2022) | EL PASO | 2026-08-06 | $6,996,635.80 | $6,996,635.80 |
| Rank 2of 14 | FM 3005: Kiva Rd to S of 89th St | GALVESTON | 2026-08-06 | $2,589,996.24 | $2,099,052.03 |
| Low bidof 10 | SL 12 from US 175 to Pemberton Hill | DALLAS | 2026-08-06 | $2,138,842.27 | $2,138,842.27 |
| Rank 4of 10 | FY 26 Supplemental Illumination | SMITH | 2026-08-06 | $743,256.48 | $655,280.25 |
| Rank 2of 13 | SH 6 - Memorial Dr to Westpark Dr | HARRIS | 2026-08-05 | $1,837,593.43 | $1,834,898.09 |
| Low bidof 7 | BU 290H, From SH 159 to Warren Ranch _ A | WALLER | 2026-08-05 | $3,894,237.41 | $3,894,237.41 |
| Rank 5of 10 | FM 517, FM 646 to SH 3 | GALVESTON | 2026-07-02 | $2,470,135.17 | $2,165,895.50 |
| Rank 2of 11 | SFT | IH 14 | Jasper Dr | Rosewood Dr | BELL | 2026-06-03 | $3,000,000.01 | $2,981,025.83 |
| Rank 2of 9 | IH 30 at Cockrell Hill Rd | DALLAS | 2026-06-02 | $1,922,000.10 | $1,547,640.51 |
| Rank 5of 12 | FM500 CR205 TO CR211 | SAN SABA | 2025-09-04 | $135,655.11 | $94,590.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.