Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
536 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 9 | REPLACE BRIDGE AND APPROACHES | BRAZORIA | 2021-01-08 | $13,281,190.29 | $12,141,991.59 |
| Rank 2of 10 | REHABILITATE BRIDGE | HARRIS | 2021-01-07 | $822,661.40 | $645,779.25 |
| Rank 4of 9 | RETAINING WALL AND DRAINAGE REPAIR | HARRIS | 2021-01-07 | $386,829.00 | $323,749.50 |
| Rank 5of 5 | REPAIR AND MAINTENANCE OF MBGF | SAN JACINTO | 2021-01-06 | $250,715.00 | $221,530.00 |
| Rank 8of 9 | CLEAN & SEAL JOINTS/EROSION CNTRL/CONC REPAIR | CHAMBERS | 2021-01-06 | $132,149.00 | $72,198.00 |
| Low bidof 4 | GUARDRAIL REPAIR | FORT BEND | 2020-12-08 | $276,267.50 | $276,267.50 |
| Low bidof 4 | CONCRETE SPALL REPAIR | FORT BEND | 2020-12-08 | $273,200.10 | $273,200.10 |
| Low bidof 4 | FULL DEPTH CONC. AND BRIDGE DECK REPAIR | HARRIS | 2020-12-03 | $996,525.00 | $996,525.00 |
| Low bidof 2 | GUARDRAIL REPAIRS | HARRIS | 2020-12-03 | $939,677.00 | $939,677.00 |
| Rank 2of 4 | BLADING (HIGH EDGE REMOVAL) | HARRIS | 2020-11-10 | $262,310.00 | $244,320.00 |
| Rank 2of 7 | BRIDGE REPAIRS | HARRIS | 2020-11-05 | $409,002.00 | $392,082.00 |
| Rank 8of 9 | RECONSTRUCT ROADWAY | HARRIS | 2020-11-04 | $29,084,880.51 | $23,186,628.85 |
| Rank 2of 8 | CONSTRUCT EAST BOUND ENTRANCE RAMP | HARRIS | 2020-10-02 | $14,879,288.76 | $14,598,295.75 |
| Rank 4of 10 | CONSTRUCT NEW 2-LANE NB FRONTAGE ROAD | BRAZORIA | 2020-10-02 | $5,124,742.95 | $4,797,528.55 |
| Rank 2of 7 | EROSION REPAIR SH 99 | HARRIS | 2020-10-02 | $5,317,627.20 | $4,645,803.92 |
| Low bidof 5 | GRAFFITI REMOVAL | HARRIS | 2020-10-02 | $434,050.00 | $434,050.00 |
| Rank 3of 9 | SIDEWALK AND ADA RAMP CONSTRUCTION | HARRIS | 2020-10-01 | $929,074.75 | $877,513.25 |
| Rank 2of 8 | ARMOR JOINT REPAIR SL8 OVER HARDY TLL RD | HARRIS | 2020-10-01 | $979,927.48 | $845,014.00 |
| Rank 2of 3 | FULL DEPTH CONCRETE PAVEMENT REPAIR | CHAMBERS | 2020-09-22 | $271,180.00 | $264,688.80 |
| Rank 3of 9 | CLN & SEAL EXIST BRIDGE JTS, DECK REPAIR | FORT BEND | 2020-09-15 | $159,122.00 | $144,187.00 |
| Low bidof 12 | CONSTRUCT U-TURN | WALLER | 2020-09-04 | $4,591,144.05 | $4,591,144.05 |
| Rank 5of 8 | INTERSECTION IMPROVEMENTS | MONTGOMERY | 2020-09-04 | $1,349,524.65 | $1,099,712.94 |
| Rank 7of 8 | PROP. RT TN LN AT W. CLAYTON & U- TURN AT BF 1960A | HARRIS | 2020-09-04 | $547,999.93 | $395,975.24 |
| Rank 3of 5 | FULL DEPTH CONCRETE PAVEMENT REPAIR | JEFFERSON | 2020-09-04 | $727,150.00 | $626,065.00 |
| Rank 7of 13 | CONSTRUCT DRAINAGE CULVERTS&REPLACE CONCRETE PVMNT | MONTGOMERY | 2020-09-03 | $3,961,743.54 | $3,360,866.55 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.