Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
536 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | GUARDRAIL REPAIR | HARRIS | 2019-08-07 | $2,389,525.00 | $1,994,275.00 |
| Low bidof 2 | MBGF/GUARDRAIL REPAIRS | CHAMBERS | 2019-07-10 | $268,740.00 | $268,740.00 |
| Low bidof 3 | METAL BEAM GUARD FENCE REPAIRS | JEFFERSON | 2019-07-10 | $646,261.00 | $646,261.00 |
| Low bidof 4 | GENERAL MAINTENANCE HOU METRO AREA | HARRIS | 2019-07-09 | $7,890,502.50 | $7,890,502.50 |
| Rank 4of 5 | REPLACE BEARING PADS | HARRIS | 2019-06-05 | $1,446,820.00 | $1,045,020.00 |
| Rank 3of 3 | SMALL SIGN INSTALLATION | HARRIS | 2019-06-05 | $994,347.00 | $578,300.00 |
| Low bidof 2 | REPAIR CONCRETE PAVEMENT AND SPALL REPAI | BRAZORIA | 2019-06-04 | $714,925.00 | $714,925.00 |
| Rank 3of 6 | REPLACE BRIDGE AND APPROACHES | BRAZORIA | 2019-05-08 | $2,910,566.78 | $2,849,523.73 |
| Rank 3of 6 | UPGRADE MBGF | GALVESTON | 2019-05-08 | $4,409,725.00 | $3,789,500.00 |
| Low bidof 2 | FULL DEPTH CONCRETE REPAIR | GALVESTON | 2019-05-08 | $461,950.00 | $461,950.00 |
| Rank 2of 4 | CONSTRUCT ONE WAY BRIDGE AND APPR | COLORADO | 2019-05-07 | $8,479,275.84 | $8,244,674.88 |
| Rank 2of 2 | CONSTRUCT NEW SIGNAL & MEDIAN CLSR | MONTGOMERY | 2019-05-07 | $828,902.75 | $574,643.65 |
| Low bidof 2 | CONCRETE STRUCTURE REPAIR | MONTGOMERY | 2019-05-07 | $292,925.00 | $292,925.00 |
| Rank 3of 3 | METAL BEAM GUARD FENCE REPAIRS | JASPER | 2019-05-07 | $516,653.00 | $415,500.00 |
| Low bidof 1 | GUARDRAIL REPAIR | BRAZORIA | 2019-04-02 | $431,552.50 | $431,552.50 |
| Rank 2of 3 | GENERAL MAINTENANCE OF IH 45 | HARRIS | 2019-04-02 | $3,921,302.50 | $2,894,122.02 |
| Rank 3of 3 | REPLACE BRIDGE AND APPROACHES | COLORADO | 2019-03-06 | $14,184,244.50 | $10,990,759.48 |
| Rank 6of 6 | REPLACE BRIDGE AND APPROACHES | FAYETTE | 2019-03-06 | $731,174.15 | $385,310.40 |
| Rank 4of 6 | REPAIR SLOPE FAILURES | HARRIS | 2019-03-06 | $3,374,312.50 | $2,794,172.98 |
| Low bidof 1 | SPOT BASE REPAIR | WALKER | 2019-02-05 | $513,435.00 | $513,435.00 |
| Low bidof 2 | GUARDRAIL REPAIR | MONTGOMERY | 2019-02-05 | $451,885.00 | $451,885.00 |
| Rank 8of 8 | SLOPE REPAIR | WHARTON | 2019-01-09 | $491,938.75 | $286,694.00 |
| Low bidof 1 | BRIDGE DECK REPLACEMENT | HARRIS | 2019-01-09 | $2,711,904.39 | $2,711,904.39 |
| Rank 2of 2 | FULL DEPTH CONC & ASPHALT REPAIR | HARRIS | 2019-01-09 | $874,120.00 | $733,405.00 |
| Rank 11of 12 | CONSTRUCT SIDEWALKS | HARRIS | 2019-01-08 | $3,679,238.05 | $2,789,052.50 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.