Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
536 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | GUARD FENCE, ATTENUATOR & METAL RAIL RPR | SAN JACINTO | 2018-07-18 | $220,266.00 | $176,695.00 |
| Rank 2of 4 | CULVERT REPLACEMENT | BRAZORIA | 2018-07-17 | $133,603.61 | $86,622.40 |
| Rank 5of 7 | WIDEN FROM 2 TO 4 LANES DIVIDED ROADWAY | FORT BEND | 2018-07-11 | $21,944,452.70 | $18,950,219.53 |
| Rank 2of 4 | SAFETY TREAT FIXED OBJECTS | FAYETTE | 2018-07-11 | $2,198,501.03 | $2,098,141.37 |
| Rank 3of 4 | ADA CURB RAMPS AND SIDEWALKS | HARRIS | 2018-07-11 | $3,129,133.29 | $2,270,623.45 |
| Rank 2of 7 | IMPROVE GUARDRAIL TO DES STANDARDS | SAN JACINTO | 2018-07-11 | $607,179.40 | $516,228.10 |
| Low bidof 3 | GRAFFITI REMOVAL | HARRIS | 2018-07-11 | $471,400.00 | $471,400.00 |
| Low bidof 3 | MBGF/GUARDRAIL REPAIRS | CHAMBERS | 2018-07-11 | $407,595.00 | $407,595.00 |
| Rank 5of 9 | REPLACE BRIDGE AND APPROACHES | AUSTIN | 2018-07-10 | $497,382.92 | $410,493.11 |
| Rank 2of 4 | SAFETY TREAT FIXED OBJECTS | LAVACA | 2018-07-10 | $1,228,100.80 | $1,147,696.00 |
| Low bidof 5 | RECONSTRUCT FRONTAGE ROADS | HARRIS | 2018-07-10 | $4,552,329.65 | $4,552,329.65 |
| Rank 2of 8 | WIDEN FROM 6 TO 8 LANES | FORT BEND | 2018-06-06 | $7,385,568.70 | $6,992,340.39 |
| Rank 2of 4 | CONC DECK REP, STRUCTURE, BEAM REP | HARRIS | 2018-06-06 | $415,259.80 | $356,092.00 |
| Rank 7of 9 | BRIDGE REPLACEMENT | MONTGOMERY | 2018-06-06 | $1,582,470.48 | $1,087,296.75 |
| Rank 4of 4 | METAL GUARDFENCE REPAIR (ON CALL) | VICTORIA | 2018-06-06 | $586,375.00 | $397,172.00 |
| Low bidof 2 | REPAIR CONCRETE PAVEMENT/SPALL REPAIR | BRAZORIA | 2018-06-06 | $617,440.00 | $617,440.00 |
| Rank 2of 6 | RECONSTRT APPRCH SLAB, ABUT BACKWALL | HARRIS | 2018-06-05 | $768,717.01 | $632,045.25 |
| Rank 2of 10 | REPLACE BRIDGE AND APPROACHES | HARRIS | 2018-06-05 | $7,758,853.01 | $7,552,754.40 |
| Low bidof 1 | GUARDRAIL REPAIR | BRAZORIA | 2018-06-05 | $477,375.00 | $477,375.00 |
| Rank 4of 4 | METAL GUARDFENCE REPAIR (ON CALL) | WHARTON | 2018-06-05 | $636,175.00 | $417,975.00 |
| Rank 2of 3 | FULL DEPTH CONCRETE REPAIR | GALVESTON | 2018-05-08 | $233,545.00 | $226,616.00 |
| Rank 2of 6 | WIDEN FROM 2 TO 4-LANE DIVIDED W/CURB & GUTTER | HARRIS | 2018-05-02 | $1,780,089.07 | $1,763,846.49 |
| Rank 8of 9 | CONSTRUCT SOUNDWALL | HARRIS | 2018-05-02 | $2,484,010.80 | $2,082,833.99 |
| Rank 4of 8 | IMPROVE GUARDRAIL TO DESIGN STAND | POLK | 2018-05-02 | $2,361,527.40 | $1,889,217.80 |
| Low bidof 4 | CONCRETE STRUCTURE REPAIR | MONTGOMERY | 2018-05-02 | $318,750.00 | $318,750.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.