Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
536 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | TOTAL REST AREA MAINTENANCE | CROSBY | 2017-04-05 | $8,877,600.00 | $5,842,800.00 |
| Rank 5of 7 | REPLACE BRIDGE AND APPROACHES | WHARTON | 2017-04-04 | $838,897.00 | $746,501.30 |
| Rank 6of 6 | ROADWAY RECONSTRUCTION | HARRIS | 2017-04-04 | $13,839,478.80 | $12,380,276.54 |
| Rank 3of 4 | PAINTING STRUCTURE | HARRIS | 2017-03-14 | $207,612.10 | $196,639.42 |
| Rank 3of 6 | EMBANKMENT AND CHANNEL STABILIZATION | WALLER | 2017-03-14 | $237,760.00 | $168,760.00 |
| Rank 4of 8 | REPAIR WINGWALL AND EROSION CONTROL | HARRIS | 2017-03-14 | $128,719.58 | $87,191.90 |
| Low bidof 3 | BRIDGE DECK REPAIR | HARRIS | 2017-03-14 | $133,700.00 | $133,700.00 |
| Rank 3of 4 | HERBICIDE | HARRIS | 2017-03-14 | $95,000.00 | $81,300.00 |
| Rank 4of 7 | BRIDGE JOINT REPAIR | WALKER | 2017-03-14 | $107,950.00 | $91,577.20 |
| Rank 2of 2 | GUARDRAIL REPAIR | HARRIS | 2017-03-08 | $1,289,125.00 | $1,222,860.00 |
| Rank 2of 4 | REMOVE AND REPLACE EXISTING DRAINAGE STRUCTURE | BRAZORIA | 2017-03-07 | $324,183.02 | $272,166.32 |
| Rank 7of 7 | REPLACE BRIDGE AND APPROACHES | SAN AUGUSTINE | 2017-03-07 | $3,596,208.22 | $2,474,844.69 |
| Low bidof 1 | GUARDRAIL REPAIR | MONTGOMERY | 2017-03-07 | $319,525.00 | $319,525.00 |
| Rank 4of 7 | TOTAL REST AREA MAINTENANCE | NOLAN | 2017-03-07 | $6,048,000.00 | $5,496,617.88 |
| Rank 10of 11 | CONSTRUCT 4-LN DIVIDED ROADWAY | FORT BEND | 2017-02-03 | $5,045,789.03 | $3,825,527.24 |
| Low bidof 1 | GUARDRAIL REPAIR | BRAZORIA | 2017-02-03 | $462,740.00 | $462,740.00 |
| Rank 5of 8 | SFTY TR FX OBJS | MONTGOMERY | 2017-02-02 | $1,560,799.30 | $978,908.20 |
| Rank 3of 5 | ROUTINE MAINTENANCE | BEXAR | 2017-02-02 | $14,106,862.50 | $12,422,429.32 |
| Rank 2of 2 | MBGF & CABLE BARRIER REPAIR | WALKER | 2017-02-02 | $419,920.00 | $269,255.00 |
| Rank 6of 8 | UPGRADE BRIDGE AND APPROACH RAILING | POLK | 2017-01-05 | $954,817.50 | $796,806.25 |
| Rank 4of 6 | REPLACE BRIDGE AND APPROACHES | WHARTON | 2017-01-05 | $994,709.35 | $902,792.10 |
| Low bidof 2 | FULL DEPTH CONCRETE REPAIR | HARRIS | 2017-01-05 | $1,464,450.00 | $1,464,450.00 |
| Low bidof 1 | GUARDRAIL REPAIR | HARRIS | 2017-01-05 | $330,200.00 | $330,200.00 |
| Low bidof 2 | FULL DEPTH CONC & ASPHALT REAIR | HARRIS | 2017-01-05 | $570,225.00 | $570,225.00 |
| Low bidof 7 | FULL DEPTH CONCRETE PAVEMENT REPAIR | HARDIN | 2017-01-05 | $344,550.00 | $344,550.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.