Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
536 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | 6504-67-001 FULL DEPTH CONCRETE | HARRIS | 2026-10-07 | $2,731,500.00 | $2,731,500.00 |
| Rank 9of 9 | Pool Hill Rd at Brookshire Creek | FORT BEND | 2026-10-06 | $3,218,689.17 | $1,963,405.10 |
| Rank 4of 4 | District Wide Crack Seal-Houston | FORT BEND | 2026-09-08 | $1,147,029.00 | $732,901.76 |
| Low bidof 6 | SS 261, IH 45 to W Crosstimbers St | HARRIS | 2026-09-02 | $1,196,117.63 | $1,196,117.63 |
| Rank 3of 11 | FM 2004 at Highland Bayou | GALVESTON | 2026-09-02 | $3,636,683.59 | $3,199,825.40 |
| Rank 3of 6 | Bridge Repair | HARRIS | 2026-08-18 | $1,901,207.60 | $1,586,560.00 |
| Rank 9of 9 | SH 99 NB FR, Fry to Westheimer Pkwy | FORT BEND | 2026-08-06 | $48,421,876.75 | $32,673,736.13 |
| Rank 5of 6 | LOUGHRIDGE DR AT LEE GULLY-BRIDGE REPLAC | CHAMBERS | 2026-08-06 | $2,137,900.16 | $1,675,109.80 |
| Rank 3of 7 | US 290 at Cypress Creek | HARRIS | 2026-08-05 | $1,597,610.40 | $1,422,408.75 |
| Rank 2of 8 | FY27 BPM | JASPER | 2026-08-05 | $1,888,415.00 | $1,880,325.00 |
| Rank 3of 5 | 6497-47-001 GUARDRAIL | HARRIS | 2026-08-05 | $2,223,557.00 | $1,532,630.00 |
| Rank 2of 4 | 2027 OA MBGF | JASPER | 2026-07-21 | $449,965.80 | $313,007.00 |
| Rank 5of 5 | FY27 MBGF | JEFFERSON | 2026-07-21 | $1,027,220.50 | $473,882.25 |
| Rank 7of 9 | BAO Bridge Repair at RailRoads FY27 | BRAZORIA | 2026-07-14 | $584,210.00 | $378,060.00 |
| Low bidof 8 | IH 10 at Wayside Dr and McCarty St | HARRIS | 2026-07-14 | $488,125.00 | $488,125.00 |
| Low bidof 4 | FY 2026 FULL DEPTH CONCRETE REPAIR | GALVESTON | 2026-07-14 | $757,739.00 | $757,739.00 |
| Rank 4of 4 | RMC 6499-83-001 | WALLER | 2026-07-14 | $880,001.00 | $327,293.72 |
| Low bidof 5 | BPM 6500-97-001 | WALLER | 2026-07-14 | $716,400.00 | $716,400.00 |
| Rank 2of 4 | 2026-07 Angelina MBGF | ANGELINA | 2026-07-08 | $162,197.50 | $133,187.00 |
| Low bidof 10 | Bridge Repair and Maintenance | HARRIS | 2026-07-02 | $898,477.00 | $898,477.00 |
| Rank 10of 11 | SH 99 SB FR, Cinco Ranch Bl to Bay Hill | FORT BEND | 2026-07-01 | $25,921,617.42 | $19,505,917.99 |
| Rank 4of 5 | FY 26-CHAMBERS/LIBERTY CNTYS-BRIDGE FUA | JEFFERSON | 2026-07-01 | $5,523,786.89 | $3,928,543.50 |
| Rank 3of 4 | FM 364-(IH 10-SH124)ADD CLTL | JEFFERSON | 2026-07-01 | $7,117,141.98 | $6,391,809.49 |
| Rank 3of 4 | ERIE ST@ LNVA CANAL-BRIDGE REPLACEMENT | JEFFERSON | 2026-06-03 | $3,748,800.71 | $3,062,119.23 |
| Rank 3of 4 | 6476-11-001 SH 288 Flexible Asset MNT | HARRIS | 2026-06-02 | $32,327,182.00 | $21,230,354.75 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.