Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
203 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 5 | TREE REMOVAL | CHEROKEE | 2019-01-08 | $843,900.00 | $661,808.00 |
| Rank 4of 6 | TREE REMOVAL | SMITH | 2019-01-08 | $871,005.00 | $691,100.00 |
| Low bidof 5 | TREE TRIMMING/BRUSH REMOVAL | VAN ZANDT | 2018-12-11 | $157,147.00 | $157,147.00 |
| Rank 2of 4 | GUIDE & CALL-OUT SIGN INSTALLATION | BOWIE | 2018-12-06 | $659,362.50 | $576,575.00 |
| Rank 2of 2 | ON CALL DITCH AND CULVERT CLEANING | HUNT | 2018-12-06 | $569,520.00 | $382,125.00 |
| Low bidof 2 | ON CALL METAL BEAM GUARD FENCE REPAIR | HUNT | 2018-12-06 | $521,535.00 | $521,535.00 |
| Low bidof 1 | CALLOUT METAL BEAM GUARD FENCE REPAIR-N | BOWIE | 2018-12-05 | $373,546.00 | $373,546.00 |
| Low bidof 1 | CALLOUT METAL BEAM GUARD FENCE REPAIR(S) | HARRISON | 2018-12-05 | $412,252.00 | $412,252.00 |
| Low bidof 1 | CALLOUT METAL BEAM GUARD FENCE REPAIR(W) | TITUS | 2018-12-05 | $304,044.00 | $304,044.00 |
| Rank 5of 10 | GUARDRAIL | VAN ZANDT | 2018-11-12 | $121,009.00 | $88,980.00 |
| Rank 2of 6 | TREE & STUMP REMOVAL (W) | UPSHUR | 2018-10-03 | $511,954.00 | $494,994.00 |
| Low bidof 3 | TREE AND STUMP REMOVAL (N) | BOWIE | 2018-10-02 | $312,170.00 | $312,170.00 |
| Rank 3of 4 | ON CALL METAL BEAM GUARD FENCE REPAIR | LAMAR | 2018-09-20 | $327,983.00 | $262,851.65 |
| Rank 4of 6 | TREE REMOVAL IN CLEAR ZONE | BAILEY | 2018-08-08 | $190,700.00 | $125,595.00 |
| Rank 7of 8 | PLANTING TREES AND SHRUBS | SMITH | 2018-08-07 | $160,320.00 | $131,480.00 |
| Low bidof 4 | ON CALL POTHOLE REPAIR | HUNT | 2018-07-19 | $99,750.00 | $99,750.00 |
| Rank 9of 9 | BRIDGE REPLACEMENT | HOPKINS | 2018-07-10 | $337,849.18 | $253,519.42 |
| Rank 5of 6 | TRAFFIC CONTROL | WOOD | 2018-07-10 | $1,596,460.00 | $1,263,543.72 |
| Rank 3of 5 | ON CALL TREE TRIMMING | HUNT | 2018-06-21 | $308,950.00 | $212,505.00 |
| Low bidof 3 | GUARDRAIL REPAIR | WOOD | 2018-06-12 | $189,884.00 | $189,884.00 |
| Rank 4of 4 | DISTRICT GROUNDS TREE TRIMMING & REMOVAL | DALLAS | 2018-06-12 | $156,900.00 | $80,890.00 |
| Low bidof 3 | GUARDRAIL REPAIR | SMITH | 2018-06-06 | $400,142.00 | $400,142.00 |
| Low bidof 3 | GUARDRAIL REPAIR | GREGG | 2018-06-05 | $418,248.00 | $418,248.00 |
| Rank 2of 4 | TREE REMOVAL | GREGG | 2018-04-04 | $352,720.00 | $306,350.00 |
| Rank 5of 7 | TREE REMOVAL | GRAY | 2018-03-21 | $153,100.00 | $132,500.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.