Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
164 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 5 | ROADSIDE MOWING MCCULLOCH 2025 | MCCULLOCH | 2025-10-15 | $496,800.00 | $339,148.80 |
| Rank 5of 5 | ROADSIDE MOWING SAN SABA 2025 | SAN SABA | 2025-10-15 | $460,020.00 | $281,992.26 |
| Rank 2of 2 | FY 26 Expressway Mowing/Litter Removal | CAMERON | 2025-10-09 | $2,146,952.80 | $1,330,728.23 |
| Low bidof 9 | FY26, Mowing of Right of Way, Palo Pinto | PALO PINTO | 2025-10-08 | $1,250,155.00 | $1,250,155.00 |
| Rank 5of 6 | TOM GREEN COUNTY MOWING (RURAL) FY 26 | TOM GREEN | 2025-10-02 | $371,200.00 | $186,000.00 |
| Rank 3of 6 | FY 26 - METAL BEAM GUARD FENCE REPAIR | MCLENNAN | 2025-09-04 | $1,174,808.30 | $1,102,226.50 |
| Rank 8of 8 | Mowing Crockett FY 26 | CROCKETT | 2025-08-21 | $337,350.00 | $139,289.10 |
| Rank 7of 7 | Mowing Sutton/Schleicher FY 26 | SUTTON | 2025-08-21 | $498,210.00 | $234,881.00 |
| Low bidof 4 | FY 25 SAAO Hays Co. Mowing | HAYS | 2025-08-13 | $242,610.00 | $242,610.00 |
| Rank 3of 4 | FY 25 Urban Mowing | JEFFERSON | 2025-08-08 | $1,216,684.00 | $1,005,084.00 |
| Low bidof 3 | FY26 Metal Beam Guardrail Repair HES | ERATH | 2025-08-08 | $524,135.00 | $524,135.00 |
| Rank 4of 4 | 648730001 Expwy Mowing & Litter Removal | HIDALGO | 2025-08-07 | $1,482,271.80 | $1,296,843.44 |
| Rank 3of 4 | 6484-77-001 FM Mowing (Hidalgo) | HIDALGO | 2025-07-22 | $1,126,835.00 | $817,470.07 |
| Low bidof 2 | ROADSIDE MOWING (CALL-OUT) BROWN 2025 | BROWN | 2025-07-09 | $340,500.00 | $340,500.00 |
| Rank 3of 4 | Mowing - Tom Green (Urban) FY 26 | TOM GREEN | 2025-07-08 | $286,720.00 | $241,395.00 |
| Rank 4of 7 | GTAO - FY 25 Small Sign Upgrades | TRAVIS | 2025-07-02 | $635,236.25 | $504,526.50 |
| Low bidof 7 | FY26 Guardrail Repair North Tarrant | TARRANT | 2025-07-01 | $1,434,062.00 | $1,434,062.00 |
| Low bidof 8 | FY26 Guardrail Repair Johnson | JOHNSON | 2025-06-05 | $865,191.00 | $865,191.00 |
| Rank 3of 4 | 2026 ORANGE AREA MBGF | JASPER | 2025-06-04 | $796,470.00 | $671,470.00 |
| Rank 3of 4 | FY26 MBGF & Cable Barrier Repair | JEFFERSON | 2025-06-04 | $990,701.00 | $622,654.00 |
| Low bidof 3 | FY25 Mowing, Litter Removal N Tarrant | TARRANT | 2025-06-04 | $681,912.50 | $681,912.50 |
| Rank 2of 6 | FY25 Mowing Jack and Wise | WISE | 2025-04-28 | $777,676.70 | $732,707.44 |
| Rank 5of 5 | 2025-03 Nacogdoches Mowing | NACOGDOCHES | 2025-04-23 | $428,798.80 | $281,450.99 |
| Rank 7of 8 | Tree Trimming in McLennan | MCLENNAN | 2025-04-21 | $238,046.00 | $148,867.50 |
| Rank 8of 8 | Tree Trimming - Hill AO | HILL | 2025-04-21 | $625,835.00 | $390,597.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.