Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
78 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | JOINT CLEANING AND SEALING | SMITH | 2020-10-01 | $342,507.00 | $197,031.00 |
| Rank 2of 7 | BRIDGE PREVENTATIVE MAINTENANCE | TARRANT | 2020-09-03 | $298,475.69 | $275,544.00 |
| Rank 5of 5 | BASE FAILURE PAVEMENT REPAIR | LIMESTONE | 2020-05-08 | $1,233,367.20 | $434,030.75 |
| Rank 5of 5 | BASE FAILURE PAVEMENT REPAIR | FALLS | 2020-05-07 | $1,003,079.75 | $435,115.30 |
| Rank 2of 8 | PEDESTRIAN, SIDEWALKS AND CURB RAMPS | BRAZOS | 2019-08-06 | $1,134,476.31 | $1,105,702.15 |
| Rank 4of 6 | GRDG, WDN, STRCS, BASE, SURF, SGNS, MRKGS | ROBERTSON | 2019-02-05 | $2,355,134.68 | $1,723,096.58 |
| Rank 5of 5 | WIDEN ROADWAY, EDGLN & CTRLN PROFL MRK | MILAM | 2018-12-06 | $1,920,462.76 | $1,262,197.65 |
| Rank 4of 4 | BRIDGE REHABILITATION (DALE MILLER BRIDGE) | NUECES | 2018-11-06 | $6,837,146.00 | $4,671,605.00 |
| Rank 3of 3 | DISTRICTWIDE BRIDGE JOINT REPAIR | TRAVIS | 2018-11-06 | $6,178,200.00 | $2,690,761.20 |
| Rank 2of 4 | BRIDGE MAINTENANCE | CROCKETT | 2018-10-10 | $173,716.00 | $139,433.69 |
| Rank 3of 3 | CLEAN & SEAL JOINT AND/OR CRACK (ASPHALT CONCRETE) | KAUFMAN | 2018-10-10 | $289,153.00 | $149,267.20 |
| Low bidof 2 | CLEAN & SEAL JOINT AND/OR CRACK (ASPHALT CONCRET) | DALLAS | 2018-10-10 | $260,060.00 | $260,060.00 |
| Rank 2of 2 | CLEAN & SEAL JOINT AND/OR CRACK (ASPHALT CONCRETE) | DALLAS | 2018-10-10 | $166,740.00 | $97,718.60 |
| Rank 3of 3 | CLEAN & SEAL JOINT AND/OR CRACK (ASPHALT CONCRETE) | DENTON | 2018-10-10 | $376,140.00 | $166,495.00 |
| Rank 7of 7 | UPGRADE MBGF | CAMP | 2018-10-03 | $1,179,365.00 | $934,655.00 |
| Rank 8of 9 | BRIDGE PREVENTATIVE MAINTENANCE | COOKE | 2018-10-03 | $916,598.60 | $661,891.50 |
| Rank 3of 4 | DEBRIS REMOVAL, REPAIR EMBANKMENT | TRAVIS | 2018-10-03 | $618,730.00 | $401,923.00 |
| Rank 2of 2 | CLEAN & SEAL JOINT AND/OR CRACK (ASPHALT CONCRETE) | DALLAS | 2018-10-03 | $268,060.00 | $173,735.75 |
| Rank 2of 2 | CLEAN/SEAL JOINT AND/OR CRACKS (ASPHALT CONCRETE) | ELLIS | 2018-10-03 | $346,050.00 | $135,730.00 |
| Rank 2of 2 | CRACK SEAL | HIDALGO | 2018-10-03 | $1,353,600.00 | $1,105,900.00 |
| Rank 4of 7 | REMOVE AND REPLACE EXISTING DRAINAGE STRUCTURE | BRAZORIA | 2018-10-02 | $594,897.00 | $433,600.50 |
| Rank 5of 5 | 2019 DISTRICT CRACK SEAL | CHILDRESS | 2018-10-02 | $1,125,300.00 | $545,451.80 |
| Rank 2of 2 | CRACK SEAL FALL | AUSTIN | 2018-10-02 | $749,718.00 | $461,505.28 |
| Rank 3of 3 | CLEAN & SEAL JOINT AND/OR CRACK (ASPHALT CONCRETE) | DALLAS | 2018-10-02 | $341,420.00 | $190,590.00 |
| Rank 3of 3 | CLEANING AND SEALING CRACKS | POLK | 2018-09-19 | $258,036.00 | $135,897.55 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.