Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
78 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 6 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | GRIMES | 2023-08-02 | $1,071,510.21 | $854,654.98 |
| Rank 4of 4 | SPOT BASE REPAIR | WASHINGTON | 2023-05-04 | $3,686,325.00 | $1,067,637.50 |
| Rank 5of 5 | FLEXIBLE BASE | BRAZOS | 2022-12-07 | $287,820.00 | $172,500.00 |
| Rank 4of 4 | ROCK/RIPRAP | BRAZOS | 2022-12-07 | $460,324.00 | $284,000.00 |
| Rank 4of 4 | FLEXIBLE BASE | WASHINGTON | 2022-12-06 | $309,675.00 | $153,000.00 |
| Low bidof 2 | ROCK/RIPRAP | WASHINGTON | 2022-10-25 | $147,007.00 | $147,007.00 |
| Rank 3of 3 | ROCK/RIPRAP | WASHINGTON | 2022-10-11 | $137,284.00 | $74,575.00 |
| Rank 2of 4 | INSTALL RAISED MEDIAN | BRAZOS | 2022-08-03 | $5,506,567.33 | $5,236,845.06 |
| Low bidof 5 | ROCK/RIPRAP | BRAZOS | 2022-06-07 | $214,100.00 | $214,100.00 |
| Low bidof 4 | ROCK/RIPRAP | WASHINGTON | 2022-06-07 | $218,700.00 | $218,700.00 |
| Rank 6of 6 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LN | ROBERTSON | 2021-11-03 | $983,879.97 | $734,212.86 |
| Rank 3of 6 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | GRIMES | 2021-09-02 | $236,426.35 | $199,660.59 |
| Rank 4of 4 | INSTALL RAISED MEDIAN | BRAZOS | 2021-08-04 | $1,669,681.36 | $1,423,096.93 |
| Low bidof 5 | ROCK/RIPRAP | WASHINGTON | 2021-06-08 | $176,909.00 | $176,909.00 |
| Low bidof 6 | ROCK/RIPRAP | BRAZOS | 2021-06-08 | $170,447.00 | $170,447.00 |
| Rank 6of 6 | SPOT BASE REPAIR | BRAZOS | 2021-06-03 | $1,609,517.00 | $654,817.50 |
| Rank 9of 10 | INTERSECTION IMPROVEMENTS, RT & LT TURN LANES | WALKER | 2021-02-05 | $2,988,776.90 | $2,117,590.11 |
| Rank 4of 7 | RAMP MODIFICATIONS, BRIDGE & PAVEMENT REPAIRS | LEON | 2021-02-04 | $2,025,599.88 | $1,382,171.20 |
| Rank 5of 5 | MILL AND INLAY | MADISON | 2021-02-04 | $2,749,798.45 | $1,673,115.05 |
| Low bidof 7 | REPAIR OF EXISTING BRIDGE BEAM | PALO PINTO | 2020-11-19 | $41,824.00 | $41,824.00 |
| Rank 5of 5 | BRIDGE AND CONCRETE REPAIR (CALL-OUT) | BROWN | 2020-11-19 | $267,497.50 | $153,795.00 |
| Rank 5of 6 | FY 2021 BPM PROJECT | MOORE | 2020-11-05 | $778,950.58 | $666,089.66 |
| Rank 5of 14 | BRIDGE JOINT REPAIR | ECTOR | 2020-11-05 | $254,429.30 | $173,811.00 |
| Rank 4of 5 | GRAFFITI REMOVAL | HARRIS | 2020-10-02 | $702,980.00 | $434,050.00 |
| Rank 8of 8 | BR - BRIDGE REPLACEMENT | MILAM | 2020-10-01 | $1,990,548.71 | $1,185,695.65 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.