Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
555 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | MILL AND INLAY | TOM GREEN | 2021-05-05 | $2,926,010.00 | $1,537,621.15 |
| Low bidof 3 | DENSE GRADED HOT MIX | HUNT | 2021-04-15 | $220,500.00 | $220,500.00 |
| Low bidof 2 | DENSE GRADED HOT MIX | RED RIVER | 2021-04-15 | $244,000.00 | $244,000.00 |
| Low bidof 2 | DENSE GRADED HOT MIX | LAMAR | 2021-04-15 | $244,000.00 | $244,000.00 |
| Low bidof 1 | DENSE GRADED HOT MIX | FRANKLIN | 2021-04-15 | $303,000.00 | $303,000.00 |
| Low bidof 1 | DENSE GRADED HOT MIX | DELTA | 2021-04-15 | $276,000.00 | $276,000.00 |
| Rank 3of 3 | REHABILITATE EXISTING ROADWAY | HARTLEY | 2021-04-08 | $10,110,536.74 | $9,656,579.22 |
| Rank 4of 4 | REHABILITATION OF AN EXISTING 4 LANE HIGHWAY | TITUS | 2021-04-08 | $4,537,284.07 | $3,739,806.75 |
| Rank 2of 4 | PREVENTIVE MAINTENANCE | LAMAR | 2021-04-07 | $1,333,265.50 | $1,317,401.90 |
| Rank 2of 3 | FLEXIBLE BASE | LAMAR | 2021-04-07 | $1,022,522.50 | $995,475.00 |
| Low bidof 2 | DENSE GRADED HOT MIX | FANNIN | 2021-03-23 | $203,000.00 | $203,000.00 |
| Low bidof 1 | HOT-MIX COLD-LAID | TITUS | 2021-03-17 | $78,187.50 | $78,187.50 |
| Low bidof 3 | HMAC PICKUP/DELIVERY(MATERIALS ONLY) | CARSON | 2021-03-11 | $268,300.00 | $268,300.00 |
| Rank 6of 6 | RESURFACE ROADWAY | WICHITA | 2021-03-05 | $9,280,465.81 | $7,059,433.85 |
| Rank 3of 3 | INTERSECTION IMPROVEMENTS | RANDALL | 2021-02-05 | $4,772,985.28 | $4,103,043.60 |
| Rank 10of 12 | ADD PASSING LANES | SUTTON | 2021-02-04 | $25,047,823.45 | $19,351,496.78 |
| Rank 2of 3 | FLEXBASE MATERIALS ONLY | WOOD | 2021-01-12 | $60,500.00 | $54,890.00 |
| Rank 2of 3 | FLEXBASE MATERIALS ONLY | SMITH | 2021-01-12 | $220,500.00 | $171,270.00 |
| Rank 4of 4 | MILL AND INLAY | ECTOR | 2021-01-08 | $2,679,428.01 | $1,923,613.94 |
| Rank 4of 6 | CONSTRUCT OVERPASS | GLASSCOCK | 2021-01-07 | $30,258,502.94 | $26,934,934.61 |
| Low bidof 2 | PREVENTIVE MAINTENANCE | HOPKINS | 2020-12-03 | $10,898,058.14 | $10,898,058.14 |
| Rank 5of 5 | SPOT REPAIR MILL AND FILL | TAYLOR | 2020-12-03 | $1,584,424.56 | $1,250,590.25 |
| Low bidof 8 | RESTORATION OF EXISTING ROAD | GLASSCOCK | 2020-12-02 | $25,932,282.85 | $25,932,282.85 |
| Low bidof 5 | MILL AND FILL WITH SPOT REPAIR | MITCHELL | 2020-12-02 | $14,755,469.98 | $14,755,469.98 |
| Low bidof 3 | DENSE GRADE HOT MIX - MATERIALS ONLY | GRAYSON | 2020-12-02 | $578,000.00 | $578,000.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.