Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
557 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | ACP OVERLAY | TOM GREEN | 2018-06-05 | $5,569,986.56 | $4,500,317.86 |
| Rank 4of 6 | BASE REPAIR AND OVERLAY | KAUFMAN | 2018-06-05 | $12,294,652.06 | $11,461,243.20 |
| Rank 4of 6 | WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAY | CRANE | 2018-05-02 | $24,575,225.47 | $20,285,448.77 |
| Rank 5of 9 | EXTEND CULVERTS AND WIDEN PAVEMENT | COOKE | 2018-05-02 | $3,528,554.82 | $2,899,372.26 |
| Rank 2of 6 | OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRIPS,STRIPING | DALLAM | 2018-05-02 | $10,649,914.62 | $10,092,335.71 |
| Rank 6of 8 | REHABILITATION OF EXISTING ROADWAY | PARMER | 2018-05-01 | $20,746,975.58 | $17,450,676.08 |
| Rank 3of 4 | ROADWAY REHABILITATION | MIDLAND | 2018-05-01 | $8,864,694.12 | $8,191,797.91 |
| Rank 6of 6 | THICK OVERLAY,PAV REPAIR,SIGNS,BMGF,HSIP IMPROVE | MOORE | 2018-04-04 | $11,408,328.47 | $11,242,986.20 |
| Low bidof 3 | OVERLAY | MITCHELL | 2018-04-04 | $1,291,681.52 | $1,291,681.52 |
| Rank 3of 3 | REHABILITATION OF EXISTING ROADWAY | ROCKWALL | 2018-04-03 | $4,119,041.58 | $3,411,242.52 |
| Rank 3of 3 | MILL AND INLAY TRAVEL LANES | TOM GREEN | 2018-04-03 | $3,568,741.88 | $2,731,400.55 |
| Rank 3of 3 | ROADWAY REHABILITATION | ECTOR | 2018-03-07 | $15,656,638.38 | $11,187,689.04 |
| Rank 2of 3 | ACP SURFACE & PAV MARKINGS | BOWIE | 2018-03-07 | $1,331,642.89 | $1,149,721.78 |
| Rank 2of 3 | TEXTURIZE SHOULDERS & CL TEXTURING | CASS | 2018-03-07 | $3,621,333.09 | $3,512,191.16 |
| Rank 6of 6 | OVERLAY | TAYLOR | 2018-03-07 | $1,279,945.07 | $1,017,875.25 |
| Rank 3of 4 | TRT BASE,1-CST,4"SPC & LTD C&G | NOLAN | 2018-03-07 | $1,878,886.94 | $1,487,306.61 |
| Rank 4of 6 | BASE REPAIR, OVERLAY | COLLIN | 2018-03-06 | $1,633,109.63 | $1,442,157.61 |
| Low bidof 3 | PLANE ACP, ACP SURF, & PAV MARK | TITUS | 2018-03-06 | $2,501,081.88 | $2,501,081.88 |
| Rank 3of 5 | ACP OVERLAY AND SAFETY TREAT FIXED OBJECTS | REAGAN | 2018-03-06 | $8,471,497.76 | $6,531,381.35 |
| Rank 3of 4 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | KNOX | 2018-02-02 | $8,712,500.78 | $6,559,485.05 |
| Rank 5of 5 | ADD PASSING LANES | KIMBLE | 2018-02-02 | $7,424,020.08 | $5,713,900.34 |
| Low bidof 6 | REHAB EXISTING ROADWAY | CARSON | 2018-02-02 | $10,873,603.31 | $10,873,603.31 |
| Rank 5of 5 | MISCELLANEOUS WORK | DONLEY | 2018-02-01 | $1,778,377.06 | $1,185,394.60 |
| Rank 6of 7 | PAVEMENT REPAIR, SEAL AND PFC OVERLAY (EB ONLY) | COOKE | 2018-02-01 | $2,382,174.06 | $2,124,211.95 |
| Rank 2of 8 | ROADWAY REHABILITATION / ARMORING | NOLAN | 2018-02-01 | $3,687,664.28 | $3,160,245.06 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.