Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
555 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 5 | US 82; US 183 to CR 218 | BAYLOR | 2025-02-07 | $7,183,118.91 | $5,952,851.12 |
| Low bidof 5 | US 84 0053-08 N OF FM 1611 TO AVE E WB | SCURRY | 2025-02-07 | $8,390,975.64 | $8,390,975.64 |
| Rank 3of 6 | 0140-13-020 IH 10 ACP OVERLAY | CROCKETT | 2025-02-06 | $26,437,779.42 | $24,564,336.71 |
| Rank 3of 5 | SH 6 FM 2534, S to SH 222 | KNOX | 2025-02-06 | $4,508,966.64 | $4,478,135.70 |
| Rank 4of 5 | SH 214 Sup 2 Morton to Yoakum | COCHRAN | 2025-01-08 | $33,866,913.81 | $28,894,124.45 |
| Rank 4of 4 | US67_REAGAN_C/L_E_OF_CR225 | UPTON | 2025-01-08 | $18,500,000.00 | $13,723,465.92 |
| Low bidof 4 | US 75 Heavy Overlay 2b | GRAYSON | 2025-01-07 | $14,667,931.64 | $14,667,931.64 |
| Rank 2of 3 | 0069-04-047 US 87 Sterling Co. Seal Coat | STERLING | 2025-01-07 | $23,083,443.35 | $22,843,598.24 |
| Rank 2of 2 | Dense Graded Hot Mix - Grayson County | GRAYSON | 2025-01-07 | $1,079,000.00 | $1,071,461.00 |
| Rank 2of 6 | REMOVE/REPLACE BRIDGE RAIL | LAMB | 2024-12-04 | $29,205,228.91 | $25,868,924.00 |
| Rank 7of 9 | PREVENTIVE MAINTENANCE | SHACKELFORD | 2024-12-04 | $6,395,104.62 | $5,659,269.00 |
| Rank 3of 5 | PREVENTIVE MAINTENANCE | ARMSTRONG | 2024-11-06 | $20,630,582.92 | $19,891,474.25 |
| Rank 4of 4 | ROCK/RIPRAP | HUNT | 2024-10-17 | $618,198.00 | $445,000.00 |
| Low bidof 2 | AGGREGATE | HARRISON | 2024-10-09 | $1,118,576.40 | $1,118,576.40 |
| Low bidof 1 | HOT MIX | MORRIS | 2024-10-09 | $377,000.00 | $377,000.00 |
| Low bidof 2 | HOT MIX | UPSHUR | 2024-10-09 | $387,000.00 | $387,000.00 |
| Low bidof 1 | HOT MIX | CASS | 2024-10-09 | $415,200.00 | $415,200.00 |
| Low bidof 1 | HOT MIX | TITUS | 2024-10-09 | $377,000.00 | $377,000.00 |
| Low bidof 1 | HOT MIX | BOWIE | 2024-10-09 | $412,700.00 | $412,700.00 |
| Low bidof 1 | HOT MIX | BOWIE | 2024-10-09 | $402,700.00 | $402,700.00 |
| Rank 3of 3 | HAZARD ELIMINATION & SAFETY | POTTER | 2024-10-02 | $34,218,919.75 | $30,982,053.94 |
| Rank 2of 4 | REHABILITATE EXISTING ROADWAY | CASS | 2024-10-02 | $17,733,004.47 | $17,425,888.06 |
| Low bidof 4 | OV | BOWIE | 2024-10-02 | $2,429,230.47 | $2,429,230.47 |
| Low bidof 4 | RESURFACE ROADWAY | HOWARD | 2024-10-01 | $7,656,688.52 | $7,656,688.52 |
| Rank 2of 2 | HOT-MIX COLD-LAID | LAMAR | 2024-10-01 | $1,816,100.00 | $1,624,400.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.