Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
111 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 2 | Guardrail Dumas AE FY 26 | MOORE | 2025-11-24 | $376,352.00 | $376,352.00 |
| Rank 4of 5 | Plainview MBGF and Cable Callout Repair | HALE | 2025-10-14 | $669,363.00 | $467,721.00 |
| Rank 2of 5 | FY26 Littlefield and Lubbock Crack Seal | PARMER | 2025-09-09 | $473,509.35 | $464,211.16 |
| Low bidof 4 | 6487-74-001 Cleaning & Sealing Cracks | ECTOR | 2025-09-09 | $405,594.00 | $405,594.00 |
| Rank 3of 3 | Crack Seal 07 0825 | COLLIN | 2025-08-13 | $154,330.00 | $131,448.01 |
| Rank 4of 4 | Crack Seal Denton 04 0825 | DENTON | 2025-08-13 | $150,500.00 | $70,637.20 |
| Rank 2of 4 | 6485-94-001 Crack Seal | ANDREWS | 2025-08-12 | $303,302.00 | $274,434.00 |
| Rank 7of 7 | GTAO - FY 25 Small Sign Upgrades | TRAVIS | 2025-07-02 | $859,820.00 | $504,526.50 |
| Rank 4of 4 | 6484-66-001 MBGF (Callout) | ECTOR | 2025-06-10 | $423,925.00 | $271,110.00 |
| Low bidof 4 | 6480-62-001 Culvert Cleaning | REEVES | 2025-03-11 | $132,476.00 | $132,476.00 |
| Rank 4of 6 | FY 25 Amarillo Area Cable Barrier | POTTER | 2025-02-27 | $359,324.00 | $259,524.00 |
| Rank 4of 6 | Pampa Area Cable Barrier Repair | CARSON | 2025-02-27 | $359,324.00 | $259,524.00 |
| Low bidof 1 | FY 25 Dumas Area Sweeping | MOORE | 2025-01-28 | $240,725.00 | $240,725.00 |
| Low bidof 5 | CRACK SEAL | KIMBLE | 2024-11-19 | $737,490.43 | $737,490.43 |
| Rank 3of 3 | SWEEPING AND DEBRIS REMOVAL | PECOS | 2024-11-12 | $905,289.60 | $558,584.64 |
| Rank 4of 7 | CABLE MEDIAN BARRIER SYSTEM REPAIR | ECTOR | 2024-10-08 | $473,055.00 | $363,685.00 |
| Rank 3of 7 | CABLE MEDIAN BARRIER SYSTEM REPAIR | MIDLAND | 2024-10-08 | $504,714.00 | $463,943.00 |
| Rank 2of 3 | METAL BEAM GUARD FENCE REPAIR | POTTER | 2024-07-09 | $655,210.00 | $642,555.00 |
| Low bidof 5 | SMALL SIGN MAINTENANCE | RUNNELS | 2024-05-07 | $229,500.00 | $229,500.00 |
| Rank 3of 4 | METAL BEAM GUARD FENCE REPAIR | SCURRY | 2024-05-03 | $974,510.00 | $820,390.60 |
| Low bidof 4 | METAL BEAM GUARD FENCE REPAIR | ECTOR | 2024-05-03 | $287,177.00 | $287,177.00 |
| Rank 2of 4 | DELINEATOR INSTALLATION | TOM GREEN | 2024-04-23 | $282,980.00 | $224,580.50 |
| Rank 3of 4 | DELINEATOR INSTALLATION | SUTTON | 2024-04-23 | $303,100.00 | $221,444.10 |
| Rank 4of 5 | METAL BEAM GUARD FENCE REPAIR | PECOS | 2024-04-05 | $473,670.00 | $348,012.00 |
| Rank 2of 5 | METAL BEAM GUARD FENCE REPAIR | MIDLAND | 2024-04-05 | $341,205.00 | $317,615.20 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.