Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
95 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | Full Depth Concrete US75 FY26 | GRAYSON | 2025-07-24 | $496,711.00 | $496,711.00 |
| Rank 3of 4 | Site Specific Full Depth Concrete FY26 | HOPKINS | 2025-07-02 | $2,248,740.00 | $1,988,500.00 |
| Rank 3of 4 | FY26 BAO FDCR | JEFFERSON | 2025-07-01 | $998,915.00 | $879,310.00 |
| Rank 4of 6 | 2026 ORANGE AREA FDCR | JASPER | 2025-06-17 | $274,900.00 | $150,459.00 |
| Rank 4of 5 | FY 25 CRCP on IH 27 | LUBBOCK | 2025-03-05 | $2,840,110.80 | $2,186,698.96 |
| Rank 2of 4 | US 59 from S of FM 2148 to Sulphur River | BOWIE | 2025-01-08 | $2,438,635.20 | $2,402,680.34 |
| Rank 2of 6 | FY 2025 Concrete Pavement US 75 | GRAYSON | 2025-01-07 | $1,692,529.00 | $1,472,289.00 |
| Low bidof 2 | REHABILITATION OF EXISTING ROADWAY | GARZA | 2024-08-01 | $1,099,065.54 | $1,099,065.54 |
| Low bidof 3 | REHABILITATE EXISTING ROADWAY | HALE | 2024-04-04 | $1,747,472.00 | $1,747,472.00 |
| Rank 2of 3 | REHABILITATE EXISTING ROADWAY | HALE | 2023-12-06 | $1,783,142.00 | $1,764,772.00 |
| Rank 2of 4 | PREVENTIVE MAINTENANCE | GRAYSON | 2023-11-02 | $1,847,400.00 | $1,696,572.00 |
| Low bidof 2 | CONCRETE SPALL REPAIR | BOWIE | 2023-08-02 | $6,993,700.00 | $6,993,700.00 |
| Low bidof 2 | FULL DEPTH CONCRETE REPAIR | HOPKINS | 2023-08-02 | $2,947,460.00 | $2,947,460.00 |
| Low bidof 4 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2023-06-27 | $872,711.00 | $872,711.00 |
| Rank 3of 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | GRAYSON | 2022-10-06 | $996,300.35 | $732,932.05 |
| Rank 4of 5 | FULL DEPTH CONCRETE REPAIR | JEFFERSON | 2022-09-07 | $1,148,490.00 | $898,275.00 |
| Low bidof 3 | FULL DEPTH CONCRETE REPAIR | HOPKINS | 2022-06-29 | $1,648,115.00 | $1,648,115.00 |
| Rank 6of 6 | REPAIR ROADWAY | NAVARRO | 2021-12-02 | $6,684,427.00 | $3,870,961.80 |
| Rank 5of 6 | BRIDGE MAINTENANCE | PANOLA | 2021-09-02 | $617,782.00 | $310,940.00 |
| Rank 4of 7 | FULL DEPTH CONCRETE REPAIR | JEFFERSON | 2021-09-01 | $1,106,060.00 | $873,550.00 |
| Rank 4of 4 | FULL DEPTH CONCRETE REPAIR | WICHITA | 2021-08-05 | $1,147,400.00 | $857,850.00 |
| Rank 2of 7 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2021-07-02 | $799,999.00 | $675,350.00 |
| Low bidof 3 | FULL DEPTH CONCRETE REPAIR | POTTER | 2021-05-06 | $1,074,720.00 | $1,074,720.00 |
| Low bidof 5 | SURFACING/ROADWAY RESTORATION | GRAY | 2020-10-01 | $2,747,710.99 | $2,747,710.99 |
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2020-07-09 | $746,547.50 | $683,911.25 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.