Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
88 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | STORM SEWER & CULVERT CLEANING | EL PASO | 2020-04-29 | $192,888.00 | $192,888.00 |
| Rank 3of 3 | FY 2020 SIGNING PROJECT | EL PASO | 2020-04-09 | $2,453,642.64 | $1,766,831.30 |
| Rank 6of 6 | MILL AND INLAY (FRONTAGE ROAD) | EL PASO | 2020-04-09 | $1,026,698.52 | $719,532.16 |
| Low bidof 3 | METAL BEAM GUARDRAIL REPAIR | CULBERSON | 2020-03-25 | $266,840.00 | $266,840.00 |
| Rank 2of 2 | BARRICADES, SIGNS, TRAFFIC CONTROL | CULBERSON | 2019-11-12 | $256,334.05 | $247,750.00 |
| Low bidof 3 | ROADWAY SPALL & FULL DEPTH REPAIR | EL PASO | 2019-02-06 | $542,136.54 | $542,136.54 |
| Low bidof 3 | ROADWAY SPALL & FULL DEPTH REPAIR | EL PASO | 2019-02-06 | $689,827.35 | $689,827.35 |
| Rank 2of 4 | METAL BEAM GUARD FENCE | EL PASO | 2019-01-09 | $738,626.57 | $647,900.00 |
| Rank 5of 5 | BARRICADES, SIGNS AND TRAFFIC CONTROL | EL PASO | 2019-01-09 | $573,644.00 | $401,465.00 |
| Rank 2of 3 | STORM SEWER & CULVERT CLEANING | EL PASO | 2019-01-08 | $253,032.14 | $174,100.00 |
| Rank 4of 4 | BARRICADES, SIGNS AND TRAFFIC CONTROL | EL PASO | 2019-01-08 | $566,687.20 | $417,400.00 |
| Rank 2of 4 | PATHOLE REPAIR | EL PASO | 2018-12-06 | $427,996.74 | $394,551.00 |
| Low bidof 3 | ROADWAY POTHOLE REPAIR | EL PASO | 2018-12-06 | $458,333.99 | $458,333.99 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.