Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
61 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 13 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | HARRIS | 2020-05-07 | $6,295,228.60 | $5,499,459.69 |
| Rank 6of 6 | BRIDGE REPLACEMENT | TYLER | 2020-03-05 | $1,059,359.90 | $783,916.45 |
| Low bidof 3 | BRIDGE REPLACEMENT | TYLER | 2020-03-04 | $1,955,026.71 | $1,955,026.71 |
| Rank 5of 7 | CONSTRUCT RAMPS | HARRIS | 2019-10-03 | $2,749,056.30 | $2,241,513.86 |
| Low bidof 8 | WIDEN FROM 2 TO 4 LANES | FORT BEND | 2019-08-06 | $2,399,431.61 | $2,399,431.61 |
| Rank 3of 12 | CONSTRUCT SIDEWALKS | HARRIS | 2019-01-08 | $2,901,876.05 | $2,789,052.50 |
| Rank 12of 12 | CONSTRUCT SIDEWALKS | CHAMBERS | 2018-11-06 | $1,526,511.18 | $1,106,083.70 |
| Low bidof 6 | INTERSECTION IMPROVEMENTS | WALLER | 2018-10-03 | $1,240,388.54 | $1,240,388.54 |
| Low bidof 4 | ADA CURB RAMPS AND SIDEWALKS | HARRIS | 2018-07-11 | $2,270,623.45 | $2,270,623.45 |
| Rank 3of 5 | RECONSTRUCT FRONTAGE ROADS | HARRIS | 2018-07-10 | $4,944,945.30 | $4,552,329.65 |
| Rank 5of 8 | WIDEN FROM 6 TO 8 LANES | FORT BEND | 2018-06-06 | $8,533,611.61 | $6,992,340.39 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.