Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
61 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 7 | FM 3005: SS 342 to Core View Blvd | GALVESTON | 2026-09-03 | $2,293,251.25 | $2,086,922.00 |
| Low bidof 5 | IH 45 FR OL: N of BNSF RR to Canino | HARRIS | 2026-08-06 | $5,092,365.20 | $5,092,365.20 |
| Rank 8of 11 | SH 99 SB FR, Cinco Ranch Bl to Bay Hill | FORT BEND | 2026-07-01 | $22,652,903.37 | $19,505,917.99 |
| Rank 2of 9 | SL 8, Briar Forest to Briar Hill | HARRIS | 2026-03-04 | $2,051,246.50 | $2,049,391.00 |
| Rank 4of 4 | SH 35: FM 518 to BS 35C North | BRAZORIA | 2026-01-06 | $10,596,420.30 | $8,773,976.47 |
| Low bidof 7 | IH 610, AT BROAD STREET | HARRIS | 2026-01-06 | $3,111,482.00 | $3,111,482.00 |
| Rank 4of 12 | BS 71E SIDEWALKS 2709 | FAYETTE | 2025-12-03 | $4,358,948.60 | $4,027,354.50 |
| Rank 3of 3 | US 59 SURFACING RESTORATION 2212 | JACKSON | 2025-12-02 | $13,077,202.12 | $9,131,385.82 |
| Rank 5of 7 | FM 331 REHABILITATE ROADWAY 2612 | AUSTIN | 2025-12-02 | $12,677,851.86 | $10,744,492.63 |
| Rank 9of 10 | SH 99, Longenbaugh to FM 529 (Seg E) | HARRIS | 2025-10-08 | $10,021,013.25 | $6,547,219.34 |
| Rank 4of 11 | SH 150 W Pedestrian Improvements Project | SAN JACINTO | 2025-08-08 | $1,557,578.00 | $1,350,735.01 |
| Rank 5of 6 | SH 159 SURFACING RESTORATION 2204 | AUSTIN | 2025-08-07 | $15,770,778.05 | $12,637,639.85 |
| Rank 2of 10 | City of La Marque Emancipation Trail | GALVESTON | 2025-08-07 | $2,058,610.00 | $1,983,177.10 |
| Rank 2of 8 | Taylor Street Improvements | HARRIS | 2025-07-01 | $949,545.00 | $948,027.50 |
| Rank 6of 6 | IH 37 San Pat frontage rehab/widen2 | SAN PATRICIO | 2025-06-05 | $12,115,083.50 | $8,068,784.52 |
| Rank 2of 9 | VA Location - Bridge Repair | HARRIS | 2025-06-05 | $1,860,650.30 | $1,851,563.00 |
| Rank 5of 5 | SH 275: IH 45 to 14th Street | GALVESTON | 2025-06-04 | $12,330,788.50 | $9,764,258.62 |
| Rank 4of 4 | MOWING HIGHWAY RIGHT OF WAY | MONTGOMERY | 2024-12-04 | $1,355,324.80 | $845,281.18 |
| Rank 5of 6 | DEBRIS REMOVAL | HARRIS | 2024-10-02 | $6,775,500.00 | $4,984,734.41 |
| Rank 7of 8 | CONSTRUCT 4-LANE DIVIDED ROADWAY ON NEW ALIGNMENT | HARRIS | 2024-10-01 | $13,956,719.79 | $10,385,128.66 |
| Rank 3of 4 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | HARRIS | 2024-09-06 | $885,783.40 | $848,116.00 |
| Low bidof 4 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | HARRIS | 2024-09-05 | $10,487,209.90 | $10,487,209.90 |
| Rank 3of 6 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | GALVESTON | 2024-06-06 | $3,511,378.30 | $3,290,125.34 |
| Rank 5of 6 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | JIM WELLS | 2024-06-06 | $878,692.99 | $656,397.78 |
| Rank 5of 5 | TREE TRIMMING AND BRUSH REMOVAL | GALVESTON | 2024-06-05 | $439,400.00 | $360,600.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.