Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
37 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 6 | GR STRS BASE & SURF | ANGELINA | 2018-05-02 | $83,247,569.00 | $71,614,966.82 |
| Rank 8of 8 | GR, STRS & SURF | MCLENNAN | 2018-02-01 | $24,995,575.88 | $20,587,594.96 |
| Rank 7of 12 | ADD ONE LANE IN EACH DIRECTION | TRAVIS | 2017-12-06 | $42,669,776.99 | $36,726,431.19 |
| Rank 4of 5 | WIDEN BY ADDING TWO INSIDE LANES, ETC. | EL PASO | 2017-08-08 | $35,994,999.98 | $33,676,148.91 |
| Rank 4of 4 | RAMP IMPROVEMENTS | EL PASO | 2017-08-08 | $21,265,000.00 | $16,837,592.06 |
| Rank 4of 4 | INTERCHANGE IMPROVEMENTS | EL PASO | 2017-07-12 | $26,733,725.17 | $25,376,264.25 |
| Low bidof 9 | GR, STRS & SURF | HILL | 2017-07-11 | $63,963,884.91 | $63,963,884.91 |
| Rank 4of 7 | NEW LOCATION BRIDGE CONSTRUCTION | DALLAS | 2017-06-07 | $41,985,942.00 | $39,547,700.00 |
| Rank 2of 7 | CONSTRUCTION OF FRONTAGE ROADS | DALLAS | 2017-06-06 | $57,989,109.59 | $54,241,512.22 |
| Rank 2of 11 | REALIGN EXISTING ROADWAY | EASTLAND | 2017-03-08 | $77,888,255.58 | $76,238,256.10 |
| Rank 6of 7 | GR, STRS, BASE, SIGN, DELIN & PAVE MRKRS | BEXAR | 2017-02-02 | $225,954,353.32 | $192,301,342.54 |
| Rank 4of 7 | GR, DRAINAGE, PVMT, STR, SIGNS | ELLIS | 2017-01-04 | $69,379,004.11 | $63,971,599.94 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.