Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
97 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 2 | NEW LOCATION FREEWAY | HIDALGO | 2019-10-03 | $95,994,022.81 | $95,994,022.81 |
| Low bidof 5 | WIDEN NON-FREEWAY FROM TWO TO FOUR LANES | FORT BEND | 2019-09-06 | $81,760,171.41 | $81,760,171.41 |
| Low bidof 5 | WIDEN NON FREEWAY FROM TWO TO FOUR LANES | FORT BEND | 2019-09-06 | $42,315,988.83 | $42,315,988.83 |
| Low bidof 5 | WIDEN NON-FREEWAY FROM TWO TO FOUR LANES | BRAZORIA | 2019-09-05 | $75,955,686.00 | $75,955,686.00 |
| Rank 2of 5 | CONSTRUCT REST AREA | CULBERSON | 2019-08-07 | $32,885,777.33 | $29,328,228.91 |
| Rank 3of 5 | WIDEN FROM 2 TO 4 LANES | MONTGOMERY | 2019-08-06 | $70,199,646.13 | $65,322,056.94 |
| Rank 4of 4 | CONST 6 LN DIV RURAL | HIDALGO | 2019-03-06 | $25,345,149.53 | $21,103,891.16 |
| Rank 3of 9 | WIDEN TO 4-LANE DIVIDED | HARRIS | 2019-03-05 | $44,498,520.27 | $43,751,962.98 |
| Rank 2of 6 | CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE | CHAMBERS | 2019-02-05 | $39,822,103.60 | $35,023,918.93 |
| Rank 4of 7 | CONSTRUCT FRONTAGE ROADS | WHARTON | 2019-01-08 | $37,940,471.25 | $34,757,444.75 |
| Rank 3of 4 | INTERCHANGE IMPROVEMENTS | EL PASO | 2018-11-06 | $108,559,158.64 | $96,506,598.40 |
| Rank 4of 4 | LP 375 RAMPS & FRONTAGE ROADS | EL PASO | 2018-10-03 | $44,774,701.22 | $32,640,631.19 |
| Rank 2of 5 | RECON ML,FR & CONST OVERPASS AT CAMBRIDGE | HARRIS | 2018-09-06 | $125,940,039.84 | $116,922,668.26 |
| Rank 4of 5 | PVT,GRDING,STRS,BASE,SIGNING,ITS | AUSTIN | 2018-08-08 | $340,535,018.06 | $317,508,658.52 |
| Rank 5of 6 | GR, STRS, BASE & PAVEMENT | GALVESTON | 2018-06-05 | $253,950,428.50 | $230,477,520.47 |
| Rank 5of 5 | CONSTRUCT BUSWAY FACILITY | HARRIS | 2017-12-06 | $64,678,272.72 | $57,190,569.43 |
| Rank 8of 9 | GR, STRS & SURF | HARRIS | 2017-11-02 | $23,590,613.82 | $18,871,436.31 |
| Low bidof 11 | WIDEN TO 4-LN & CONSTR RR GR SEPARATION | FORT BEND | 2017-10-04 | $34,567,384.20 | $34,567,384.20 |
| Rank 2of 5 | WIDEN FREEWAY (SIX LANES) | WALKER | 2017-08-09 | $123,474,671.97 | $122,051,472.89 |
| Rank 4of 5 | CONST 1 MORE ML EACH DIRECTION AND REPLACE BRIDGES | WALLER | 2017-06-07 | $149,830,396.24 | $141,496,478.10 |
| Rank 2of 5 | WIDEN FREEWAY (SIX LANES) | WALKER | 2017-01-04 | $129,440,738.91 | $128,204,638.09 |
| Rank 3of 7 | RECONSTRT INTRCHANG-PHAS 1 PRIORITY DIRECT CONNECT | BEXAR | 2016-12-01 | $83,702,317.31 | $73,929,401.69 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.