Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
89 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 14 | BPM - BRIDGE REPAIRS | COLLIN | 2020-12-03 | $397,560.00 | $348,405.00 |
| Low bidof 3 | POTHOLE REPAIR | DALLAS | 2020-12-02 | $631,425.00 | $631,425.00 |
| Low bidof 3 | POTHOLE REPAIR | DALLAS | 2020-12-02 | $480,450.00 | $480,450.00 |
| Low bidof 3 | POTHOLE REPAIR | DALLAS | 2020-12-02 | $566,125.00 | $566,125.00 |
| Rank 2of 5 | REMOVAL AND DISPOSAL OF DRIFTWOOD AND DEBRIS | NAVARRO | 2020-11-04 | $978,100.00 | $901,225.00 |
| Rank 2of 5 | CULVERT REPLACEMENT | ARCHER | 2019-12-04 | $726,918.21 | $587,035.21 |
| Rank 2of 3 | POTHOLE REPAIR | KAUFMAN | 2019-12-03 | $588,500.00 | $558,750.00 |
| Low bidof 1 | MISCELLANEOUS CONCRETE REPAIR | NAVARRO | 2019-07-16 | $199,755.00 | $199,755.00 |
| Rank 4of 7 | BPM - BRIDGE BEAM/DECK REPAIR | HOPKINS | 2019-03-21 | $248,090.00 | $197,280.00 |
| Rank 3of 4 | REMOVAL & DISPOSAL OF DRIFTWOOD & DEBRIS | DENTON | 2018-12-11 | $385,500.00 | $187,663.20 |
| Rank 3of 4 | ON CALL POTHOLE REPAIR | HUNT | 2018-07-19 | $144,000.00 | $99,750.00 |
| Rank 4of 4 | PICNIC AREA MAINTENANCE | MILAM | 2018-07-17 | $52,100.00 | $31,250.00 |
| Rank 3of 4 | GRAFFITI REMOVAL | DALLAS | 2018-06-06 | $585,600.00 | $530,078.00 |
| Low bidof 3 | DRIFTWOOD REMOVAL | DALLAS | 2018-06-05 | $310,200.00 | $310,200.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.