Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
608 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | BRIDGE MAINTENANCE | DEWITT | 2024-06-06 | $538,360.00 | $538,360.00 |
| Rank 2of 5 | HAZARD ELIMINATION & SAFETY | VICTORIA | 2024-06-06 | $547,562.50 | $503,945.20 |
| Rank 7of 8 | HAZARD ELIMINATION & SAFETY | BRAZORIA | 2024-06-06 | $265,150.00 | $134,455.00 |
| Rank 4of 10 | BRIDGE PREVENTATIVE MAINTENANCE | TRAVIS | 2024-06-06 | $1,692,718.00 | $1,387,050.60 |
| Rank 2of 6 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2024-06-06 | $663,500.00 | $650,985.00 |
| Rank 4of 4 | TOTAL MAINTENANCE | HARRIS | 2024-06-06 | $12,662,247.00 | $6,910,200.00 |
| Rank 4of 4 | BRIDGE PREVENTATIVE MAINTENANCE | DEWITT | 2024-06-06 | $745,120.00 | $493,453.45 |
| Low bidof 2 | BRIDGE JOINT REPAIR | VICTORIA | 2024-06-06 | $392,750.00 | $392,750.00 |
| Rank 2of 9 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | HENDERSON | 2024-06-05 | $2,933,685.00 | $2,607,922.23 |
| Rank 7of 10 | INSTALL/REPLACE SIGNS | ERATH | 2024-06-05 | $527,850.00 | $440,339.00 |
| Low bidof 5 | EMBANKMENT STABILIZATION | RUSK | 2024-06-05 | $718,631.00 | $718,631.00 |
| Rank 3of 6 | BRIDGE MAINTENANCE | DENTON | 2024-06-05 | $1,228,425.50 | $1,117,242.04 |
| Rank 3of 7 | BRIDGE PREVENTATIVE MAINTENANCE | BRAZOS | 2024-06-05 | $612,630.00 | $455,768.00 |
| Rank 3of 5 | BRIDGE PREVENTATIVE MAINTENANCE | GRIMES | 2024-06-05 | $346,800.00 | $270,970.00 |
| Rank 2of 3 | MOWING HIGHWAY RIGHT OF WAY | JOHNSON | 2024-06-05 | $3,969,904.00 | $3,870,005.40 |
| Rank 3of 11 | SMALL SIGN REPLACEMENT | AUSTIN | 2024-05-21 | $226,400.00 | $211,980.90 |
| Rank 2of 7 | BRIDGE PREVENTATIVE MAINTENANCE | RED RIVER | 2024-05-16 | $163,800.00 | $158,160.00 |
| Rank 5of 9 | EROSION REPAIR | MEDINA | 2024-05-16 | $263,570.00 | $222,736.00 |
| Rank 6of 11 | SMALL SIGN REPLACEMENT | WHARTON | 2024-05-14 | $163,300.00 | $129,780.32 |
| Low bidof 6 | MISCELLANEOUS CONCRETE REPAIR | KAUFMAN | 2024-05-08 | $237,950.00 | $237,950.00 |
| Rank 2of 7 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | GRAYSON | 2024-05-03 | $1,244,580.00 | $1,226,270.00 |
| Low bidof 4 | EMBANKMENT STABILIZATION | HARRIS | 2024-05-03 | $223,865.00 | $223,865.00 |
| Rank 3of 5 | CONCRETE STRUCTURE REPAIR | MONTGOMERY | 2024-05-03 | $1,642,768.00 | $1,473,711.00 |
| Rank 2of 3 | BRIDGE DECK REPAIR | WALLER | 2024-05-03 | $727,500.00 | $622,750.00 |
| Rank 2of 6 | BRIDGE MAINTENANCE | DELTA | 2024-05-02 | $1,328,200.00 | $1,224,153.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.