Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
610 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 6 | EROSION REPAIR | ATASCOSA | 2023-04-19 | $97,460.00 | $86,000.71 |
| Rank 4of 8 | EROSION REPAIR | GUADALUPE | 2023-04-19 | $193,596.00 | $152,035.00 |
| Rank 2of 4 | BRIDGE REPAIR | HARRIS | 2023-04-11 | $288,200.00 | $269,150.00 |
| Rank 3of 5 | BRIDGE REPAIR | HARRIS | 2023-04-11 | $247,900.00 | $205,065.00 |
| Rank 3of 3 | METAL BEAM GUARD FENCE REPAIR | POLK | 2023-03-22 | $376,410.00 | $216,537.00 |
| Rank 4of 4 | BRIDGE PREVENTATIVE MAINTENANCE | GRAYSON | 2023-03-16 | $424,350.00 | $273,695.00 |
| Rank 4of 4 | BRIDGE PREVENTATIVE MAINTENANCE | DELTA | 2023-03-16 | $324,800.00 | $275,835.00 |
| Rank 3of 4 | BRIDGE PREVENTATIVE MAINTENANCE | RED RIVER | 2023-03-16 | $418,500.00 | $175,800.00 |
| Rank 3of 3 | METAL BEAM GUARD FENCE REPAIR | NACOGDOCHES | 2023-03-15 | $228,675.00 | $214,075.00 |
| Low bidof 4 | MISCELLANEOUS CONCRETE REPAIR | DENTON | 2023-03-14 | $212,810.00 | $212,810.00 |
| Low bidof 8 | BRIDGE SCOUR REPAIR | HARRIS | 2023-03-08 | $3,278,453.70 | $3,278,453.70 |
| Rank 5of 9 | BRIDGE PREVENTATIVE MAINTENANCE | ELLIS | 2023-03-07 | $686,200.00 | $509,810.00 |
| Rank 2of 7 | DRAINAGE IMPROVEMENT AND/OR REPAIRS | MONTGOMERY | 2023-03-07 | $742,450.00 | $713,974.00 |
| Low bidof 4 | TRAFFIC SIGNAL IMPROVEMENTS | DALLAS | 2023-02-02 | $1,765,418.20 | $1,765,418.20 |
| Low bidof 2 | MOWING HIGHWAY RIGHT OF WAY | COLLIN | 2023-02-02 | $279,048.00 | $279,048.00 |
| Rank 2of 3 | VEGETATION MANAGEMENT | KAUFMAN | 2023-02-02 | $1,548,915.00 | $1,242,886.00 |
| Low bidof 3 | VEGETATION MANAGEMENT | ROCKWALL | 2023-02-02 | $755,832.00 | $755,832.00 |
| Low bidof 5 | METAL BEAM GUARD FENCE REPAIR | FAYETTE | 2023-02-02 | $1,382,686.88 | $1,382,686.88 |
| Low bidof 5 | REPLACE GUARDRAIL | WILBARGER | 2023-02-01 | $2,143,240.00 | $2,143,240.00 |
| Rank 4of 9 | DRAINAGE IMPROVEMENTS | JOHNSON | 2023-02-01 | $577,315.00 | $524,586.50 |
| Rank 3of 3 | VEGETATION MANAGEMENT | NAVARRO | 2023-02-01 | $661,956.00 | $522,893.84 |
| Rank 2of 4 | MOWING HIGHWAY RIGHT OF WAY | DENTON | 2023-02-01 | $404,073.00 | $388,863.00 |
| Rank 3of 6 | REMOVAL AND DISPOSAL OF DRIFTWOOD | NAVARRO | 2023-02-01 | $836,360.00 | $385,634.00 |
| Rank 2of 3 | VEGETATION MANAGEMENT | KAUFMAN | 2023-02-01 | $1,691,365.00 | $1,475,750.00 |
| Rank 2of 5 | GRAFFITI REMOVAL | DALLAS | 2023-02-01 | $344,000.00 | $257,050.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.