Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
84 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | HAZARD ELIMINATION & SAFETY | MONTAGUE | 2023-08-03 | $2,737,073.30 | $2,243,728.59 |
| Low bidof 5 | HAZARD ELIMINATION & SAFETY | WISE | 2023-08-02 | $5,064,956.34 | $5,064,956.34 |
| Rank 4of 6 | CONSTRUCT REST AREA | WISE | 2023-08-02 | $2,720,538.60 | $2,289,336.40 |
| Rank 3of 5 | HAZARD ELIMINATION & SAFETY | JACK | 2023-06-27 | $1,580,992.39 | $1,303,125.13 |
| Low bidof 3 | REHABILITATE EXISTING ROADWAY | DENTON | 2023-04-05 | $1,362,510.85 | $1,362,510.85 |
| Low bidof 3 | REHABILITATE EXISTING ROADWAY | HALE | 2023-01-05 | $2,049,918.50 | $2,049,918.50 |
| Rank 3of 7 | HAZARD ELIMINATION & SAFETY | GRAYSON | 2022-11-02 | $6,374,309.20 | $5,981,039.00 |
| Rank 2of 5 | RECONSTRUCTION OF EXISTING ROADWAY | KAUFMAN | 2022-10-07 | $5,979,863.66 | $5,861,108.95 |
| Low bidof 4 | REHABILITATE EXISTING ROADWAY | WISE | 2022-10-07 | $3,489,536.12 | $3,489,536.12 |
| Rank 4of 5 | INSTALLING MEDIAN BARRIER | HARRISON | 2022-09-08 | $2,249,847.13 | $1,862,982.27 |
| Rank 5of 5 | BRIDGE REPAIR | DALLAS | 2022-09-07 | $1,620,534.00 | $1,038,346.30 |
| Rank 2of 5 | BRIDGE MAINTENANCE | DALLAS | 2022-02-04 | $9,753,323.60 | $7,163,236.67 |
| Low bidof 9 | MILL, FULL DEPTH REPAIR, OV & PAVEMENT MARKINGS | DALLAS | 2021-09-01 | $2,049,364.32 | $2,049,364.32 |
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIR | WICHITA | 2021-08-05 | $924,250.00 | $857,850.00 |
| Rank 4of 4 | BRIDGE MAINTENANCE | WICHITA | 2021-08-04 | $4,598,422.19 | $3,356,260.98 |
| Rank 3of 10 | BRIDGE MAINTENANCE | CHILDRESS | 2021-06-03 | $4,393,316.00 | $4,197,227.70 |
| Rank 3of 3 | FULL DEPTH CONCRETE REPAIR | POTTER | 2021-05-06 | $1,297,150.00 | $1,074,720.00 |
| Rank 6of 11 | BRIDGE MAINTENANCE | FREESTONE | 2021-04-07 | $1,252,491.40 | $926,052.04 |
| Rank 3of 6 | CONCRETE PAVEMENT | JONES | 2021-04-07 | $345,989.50 | $251,560.40 |
| Low bidof 10 | CABLE BARRIER INSTALLATION | DENTON | 2021-02-04 | $1,626,066.95 | $1,626,066.95 |
| Rank 6of 8 | RESURFACE ROADWAY | TARRANT | 2021-02-04 | $1,516,389.45 | $1,193,706.58 |
| Rank 3of 8 | FULL DEPTH CONCRETE REPAIR | ROCKWALL | 2021-02-04 | $812,460.00 | $737,950.00 |
| Rank 2of 3 | RESURFACE EXISTING 4 LANE DIVIDED HIGHWAY | MARION | 2021-01-07 | $3,085,848.50 | $2,827,413.51 |
| Rank 4of 12 | BRIDGE JOINT REPAIR PROGRAM (2021) | ECTOR | 2021-01-07 | $1,379,038.55 | $1,267,114.00 |
| Rank 2of 15 | 2021 BRIDGE PREVENTATIVE MAINTENANCE | COTTLE | 2020-12-03 | $398,937.00 | $359,682.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.