Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
84 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 6 | SH 360; Arkansas Ln to SH 180 | TARRANT | 2026-09-03 | $5,120,756.50 | $4,581,050.10 |
| Rank 5of 5 | HSIP Systemic Median Barrier | WISE | 2026-08-05 | $1,539,472.25 | $1,237,814.41 |
| Rank 8of 9 | IH 35W: Luella to Altamesa | TARRANT | 2026-01-06 | $5,712,079.26 | $3,872,523.74 |
| Low bidof 5 | US 59 from SH 155 to Marion C/L | CASS | 2026-01-06 | $7,736,640.89 | $7,736,640.89 |
| Rank 3of 3 | FY 26 CRCP on IH 27 Hale Co | HALE | 2025-12-03 | $2,689,358.33 | $2,229,250.50 |
| Rank 8of 8 | FULL DEPTH CONCRETE REPAIR KAUFMAN FY'26 | KAUFMAN | 2025-12-02 | $2,446,985.00 | $1,708,740.00 |
| Rank 6of 8 | SS 557 from US 80 to IH 20 | KAUFMAN | 2025-11-05 | $10,062,412.77 | $8,281,476.84 |
| Rank 2of 6 | US 75 Grayson Co Line to Valley Creek Tr | COLLIN | 2025-10-09 | $2,748,675.00 | $2,620,351.00 |
| Rank 12of 15 | BPM - US175 @ Prairie Creek 03 1025 | DALLAS | 2025-10-08 | $1,827,814.00 | $994,560.00 |
| Rank 2of 9 | RES | Pot Hole Repair along IH35 | MCLENNAN | 2025-09-05 | $2,839,861.15 | $2,806,853.80 |
| Rank 4of 10 | SH 214-NBI051850046106005-Parmer | PARMER | 2025-09-04 | $4,696,702.00 | $4,197,908.00 |
| Rank 6of 7 | US0062-2-1/2 | LUBBOCK | 2025-08-08 | $3,547,892.10 | $2,699,559.00 |
| Rank 5of 7 | SH 289 from East Broadway St to FM 455 | COLLIN | 2025-08-08 | $2,832,176.20 | $2,298,355.08 |
| Rank 5of 6 | FM 544 at Heritage Pkwy to SH 78 | COLLIN | 2025-07-02 | $1,099,703.00 | $848,975.00 |
| Rank 4of 6 | US 67 From US 67 SB at Wheatland Road | DALLAS | 2025-07-01 | $6,511,605.05 | $4,922,876.30 |
| Rank 3of 3 | ON-CALL CONCRETE REPAIR FY 2026 | WICHITA | 2025-07-01 | $2,416,200.00 | $2,136,200.00 |
| Rank 7of 7 | HSIP | SH 195 | .7S FM2670 -Williamson | BELL | 2025-05-02 | $6,308,234.10 | $4,930,555.11 |
| Rank 2of 5 | FY 25 CRCP on IH 27 | LUBBOCK | 2025-03-05 | $2,590,964.72 | $2,186,698.96 |
| Rank 3of 6 | FM 2499 FM 1171 to Tarrant CL | DENTON | 2025-02-06 | $2,366,239.07 | $1,920,304.66 |
| Rank 4of 6 | BRIDGE MAINTENANCE | LUBBOCK | 2024-09-06 | $3,572,605.90 | $2,795,872.30 |
| Low bidof 4 | REHABILITATE EXISTING ROADWAY | MCLENNAN | 2024-09-05 | $8,584,310.10 | $8,584,310.10 |
| Rank 5of 5 | HIGHWAY IMPROVEMENT | WISE | 2024-06-05 | $7,622,449.23 | $5,886,834.11 |
| Rank 2of 3 | REPAIR/REPLACE CONCRETE BARRIER | WILBARGER | 2024-05-03 | $1,428,520.40 | $1,281,471.75 |
| Low bidof 7 | FULL DEPTH CONCRETE REPAIR | DENTON | 2024-01-04 | $1,030,771.00 | $1,030,771.00 |
| Rank 7of 7 | BRIDGE JOINT CLEANING AND SEALING | DENTON | 2023-10-10 | $816,385.00 | $226,358.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.