Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
79 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 8 | BRIDGE SCOUR REPAIR | KERR | 2023-04-19 | $202,426.00 | $143,480.00 |
| Rank 4of 7 | EROSION REPAIR | KERR | 2023-04-19 | $162,560.00 | $143,077.00 |
| Rank 5of 6 | BRIDGE JOINT CLEANING AND SEALING | TOM GREEN | 2023-02-23 | $198,408.00 | $125,720.00 |
| Low bidof 7 | BRIDGE SUBSTRUCTURE REPAIR | KARNES | 2023-01-24 | $269,975.00 | $269,975.00 |
| Rank 2of 7 | EROSION REPAIR | COMAL | 2023-01-18 | $159,463.55 | $154,160.00 |
| Low bidof 9 | BRIDGE RAIL REPAIR | CALDWELL | 2022-10-06 | $285,548.36 | $285,548.36 |
| Rank 2of 7 | DRAINAGE STRUCTURE REPAIR/REPLACEMENT | BLANCO | 2021-06-04 | $887,767.30 | $710,578.70 |
| Rank 5of 7 | REPAIR ROADWAY | EDWARDS | 2021-05-06 | $1,940,134.26 | $1,670,792.30 |
| Low bidof 11 | BRIDGE REPAIR | ECTOR | 2021-05-06 | $388,307.00 | $388,307.00 |
| Rank 3of 13 | RIPRAP REPAIR | ATASCOSA | 2021-03-17 | $104,066.24 | $99,804.00 |
| Rank 5of 10 | BRIDGE MAINTENANCE | EL PASO | 2021-03-05 | $474,945.00 | $431,801.50 |
| Low bidof 14 | MISCELLANEOUS BRIDGE REPAIR | HOWARD | 2021-02-04 | $425,867.00 | $425,867.00 |
| Rank 2of 9 | REPAIR ROADWAY | EDWARDS | 2021-01-08 | $1,127,477.85 | $999,997.68 |
| Rank 2of 12 | BRIDGE JOINT REPAIR PROGRAM (2021) | ECTOR | 2021-01-07 | $1,283,837.00 | $1,267,114.00 |
| Rank 13of 17 | BRIDGE IDENTIFICATION NUMBERS | CONCHO | 2020-06-30 | $140,000.00 | $88,628.00 |
| Rank 7of 7 | BRIDGE PM PROJECT | KERR | 2020-04-15 | $268,338.75 | $126,013.00 |
| Rank 5of 11 | MISCELLANEOUS BRIDGE REPAIR | TAYLOR | 2020-02-06 | $936,185.00 | $798,993.99 |
| Rank 8of 15 | BRIDGE REPAIRS | CROCKETT | 2019-11-15 | $280,790.00 | $141,454.89 |
| Rank 6of 13 | BRIDGE REPAIRS | RUNNELS | 2019-11-15 | $166,520.00 | $95,000.00 |
| Rank 7of 12 | BRIDGE REPAIRS | IRION | 2019-11-15 | $196,920.00 | $99,000.00 |
| Rank 7of 12 | BRIDGE REPAIRS | CONCHO | 2019-11-15 | $267,600.00 | $157,962.00 |
| Low bidof 5 | STORM SEWER SYSTEM UPGRADE | BEXAR | 2019-11-13 | $163,900.00 | $163,900.00 |
| Rank 2of 6 | FLOOD DAMAGE | KIMBLE | 2019-11-05 | $1,294,482.50 | $1,068,115.00 |
| Rank 7of 8 | REPAIRING BRIDGE JOINTS AND STRIPING | ECTOR | 2019-10-03 | $1,201,810.00 | $951,628.00 |
| Rank 3of 5 | BRIDGE PREVENTATIVE MAINTENANCE | MASON | 2019-08-06 | $576,787.95 | $338,503.75 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.