Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
20 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | SH 361 Nueces HarborIsland Blk Rmps PH I | NUECES | 2026-05-07 | $41,937,000.00 | $41,937,000.00 |
| Rank 2of 2 | FERRY RAMP REPAIR | GALVESTON | 2023-06-28 | $29,465,885.36 | $24,190,000.00 |
| Low bidof 5 | FERRY OPERATION PROJECTS | NUECES | 2023-05-05 | $58,651,776.00 | $58,651,776.00 |
| Low bidof 3 | FENDER SYSTEM REPAIR | CALHOUN | 2022-10-31 | $239,370.00 | $239,370.00 |
| Rank 7of 11 | SLOPE REPAIR, INSTALL STEEL PILING | GALVESTON | 2021-02-05 | $614,721.00 | $471,058.25 |
| Low bidof 5 | REHABILITATION OF NORTH BERTHING AND LANDING | HARRIS | 2020-08-06 | $2,787,309.00 | $2,787,309.00 |
| Rank 5of 9 | FENDER SYSTEM CONSTRUCTION | HARRIS | 2020-08-06 | $14,373,650.00 | $12,567,752.00 |
| Low bidof 6 | DEMOLITION OF EXISTING TIMBER STRUCTURE | ARANSAS | 2020-06-05 | $2,681,504.00 | $2,681,504.00 |
| Rank 2of 2 | LANDING MAINTENANCE | GALVESTON | 2020-06-05 | $16,466,170.00 | $16,023,070.00 |
| Rank 2of 3 | BRIDGE MAINTENANCE | CAMERON | 2020-04-09 | $10,919,499.00 | $9,814,198.00 |
| Rank 2of 5 | FERRY LANDING GRATING PANEL SYSTEM | NUECES | 2020-04-08 | $480,055.00 | $400,545.00 |
| Low bidof 3 | DOLPHIN AND FERRY FENDER REPAIR | NUECES | 2020-01-09 | $9,587,600.00 | $9,587,600.00 |
| Low bidof 5 | REPAIR/REPLACE DOLPHIN | JEFFERSON | 2019-11-06 | $1,776,487.50 | $1,776,487.50 |
| Rank 2of 2 | FERRY BOAT OPERATIONS | HARRIS | 2019-10-03 | $6,096,879.09 | $6,051,944.83 |
| Rank 2of 3 | FERRY LANDING MAINTENANCE | GALVESTON | 2018-07-11 | $15,668,000.00 | $12,737,490.00 |
| Rank 3of 5 | FERRY RAMP REPAIR | NUECES | 2018-05-01 | $714,925.00 | $660,670.00 |
| Rank 4of 4 | DREDGING | GALVESTON | 2018-04-04 | $1,495,000.00 | $890,000.00 |
| Rank 2of 3 | LANDING 4 TOWER AND GRATING REPAIR | GALVESTON | 2017-11-02 | $354,650.00 | $326,400.00 |
| Rank 2of 3 | RECON OF FERRY BULKHEAD & WORK DOCK | GALVESTON | 2016-12-01 | $23,870,000.00 | $21,325,783.00 |
| Rank 2of 2 | MARINE EQUIPMENT MAINTENACE AND REPAIR | GALVESTON | 2016-11-03 | $1,164,500.00 | $975,375.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.